Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Ground Improvement Design and Construction for Seattle’s Elliott Bay Seawall Replacement and RetrofitBy Andrew Malinak, William Perkins
Seattle’s Elliott Bay Seawall protects the 1½ miles of downtown waterfront between South Washington and Broad streets. The seawall supports the urban waterfront and infrastructure, including the Alask
Jan 1, 2018
-
Jetting-Assisted Sheet Pile DrivingBy Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
Lower Risks With ECR®/EFT®-Measurements In Underground ConstructionsBy Patrick P. A. Wolfs
In the summer of 2000, the ECR®/EFT® was first introduced in the Netherlands. After the first project a field test was performed together with other geophysical methods to prove the liability of these
Jan 1, 2006
-
Vertically Loaded Piles In Sand Subjected To Triangular Profiles Of Soil MovementsBy W. D. Guo
With an experimental apparatus developed recently, model tests on piles were conducted in sand subjected to triangular soil movement profiles. Four instrumented piles tests are reported, which show th
Jan 1, 2006
-
Drilled Pier Foundations In Expansive Soils ? SynopsisBy F. H. Chen
the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri
Jan 1, 2010
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Friction Piles In Boston Blue Clay, Suffolk County House Of Corrections, Massachusetts ? SummaryBy Harry K. Weatherbee
The paper presents a design case study for a four-story correction facility addition in south Boston, Massachusetts, supported on friction piles driven into the Boston Blue Clay. 356 mm (14-in.) squar
Jan 1, 2003
-
An Innovative Approach To Load Testing Of High Capacity PilesBy P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Design And Performance Evaluation Of Bored Piles In SandBy Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution
Jan 1, 1994
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? SummaryBy Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin StationBy Dario Libano, Franz-Werner Gerressen
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie
Jan 1, 2017
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular SoilBy B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
Lateral Response of Large Diameter Drilled Shafts in ClayBy Ke Yang, Robert Liang
"Drilled shaft foundations are widely used for many types of structures, especially for highway bridges, high rise buildings, and costal structures. The lateral design considerations are crucial for t
Jan 1, 2005
-
Increasing Lateral Pile Stiffness Through Limited Soil ImprovementBy Thomas J. Weaver
Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat
Jan 1, 2006
-
Ultimate Uplift Capacity Of Single And Group Piles In Clay ? SynopsisBy B. M. Das
Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes
Jan 1, 2010
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005