Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part II: DM, FMI, Mass Stabilization & CSVBy Ali Porbaha
In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.
Jan 1, 2002
-
Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential BuildingBy Shawna Munn, Nadir Ansari, Toben Jerry
With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas
Jan 1, 2019
-
After Sandy: Bay Park Sewage Treatment Plant Flood ProtectionBy David Guy, John Stanbury, Gilbert Tallard
"In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage
Jan 1, 2016
-
A Study On The Evaluation Of Pile Bearing Capacity Factor And Adhesion Factor In Is 2911By Ashirbad Satapathy, Sanket Rawat, Ramanand Shukla, Ravi Kant Mittal
Bearing capacity factor (Nq) and Adhesion factor (α) are the key parameters for analyzing the load carrying capacity of pile foundations embedded in cohesionless and cohesive soils respectively. Numer
Nov 1, 2022
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Mobilizing CIDH Pile Base Resistance on the Gerald Desmond Bridge Replacement Project with Tip GroutingBy Adam Zagorski, Rusty Lucido, Curt Scheyhing
"The current California Department of Transportation (Caltrans) practice based on AASHTO LRFD Bridge Design Specifications is to use the O’Neill and Reese method (FHWA, 1999) for calculating the side
Jan 1, 2017
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Session 21 "Grouting in Karst"By Jim Henry
I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi
Feb 10, 2003
-
Experience-Based Value Engineering of Foundations & Deep Excavation Support SystemsBy Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte
Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects
Sep 8, 2021
-
Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case StudiesBy Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact
Jan 1, 2016
-
Dynamic Analysis of a Base-Isolated Bridge, Seattle, WashingtonBy Greg Nutson, Jeremy Butkovich, Bill Perkins, Hollie Ellis, Paul Bott
"Dynamic soil-structure interaction (DSSI) analyses are becoming more common in bridge designs, especially in seismically active areas. Because of its proximity to two active fault zones, the Evergree
Jan 1, 2017
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling TechniquesBy Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Design Of The BMIP Boat Section - IntroductionBy Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Deep Dry Soil Mixing Performance and Quality Control Acceptance CriteriaBy Patrick K. Wong, Richard Kelly
"The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care
Jan 1, 2015
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
The Use of the Expander Body with Cast in Situ Piles in Sandy SoilsBy Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014