Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing BridgeBy Diane Reid, Antonio Marinucci, Robin Mao
Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve
Jan 1, 2019
-
Wet Soil Mixing for Supporting Bridge Abutments on Spread FootingsBy Adam Gerondale, David Hemstreet, Lisheng Shao, Kenji Yamasaki
"Foundation soils of a proposed single-span bridge over a busy railroad in Anchorage, Alaska included a layer of sensitive, non-plastic to low-plasticity silt. Slope stability analyses showed that, wi
Jan 1, 2015
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And ClaysBy Dongwook Kim
Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD
Jan 1, 2010
-
The Use of Vibratory Driving of Foundation Piles for Offshore Applications - State of the PracticeBy Nicolas Moscoso, Gerald Verbeek, Marcel Bielefeld, Rob van Dorp
Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred:
Jan 1, 2019
-
Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression TestsBy Padmavathi V, M. Najamuddin, M. R. Madhav
Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation
Sep 1, 2022
-
Carbon Footprint Of Common Quay StructuresBy Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb
With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a
May 1, 2022
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead WallBy WenJun Dong
This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st
Sep 8, 2021
-
Numerical Modeling Of Foundation Deformation Due To Fault RuptureBy Amalia Giannakou
When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediate
-
Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko
"When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat
Jan 1, 2017
-
Monitoring Auger Cast In Place Pile Construction And Testing In Hard ClayBy C. Vipulanandan
Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing
-
East Boston Branch Sewer Relief Project: Support Of Excavation Case StudyBy Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany BayBy Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, ConnecticutBy Theodore von Rosenvinge
Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har
Jan 1, 2011
-
Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case StudyBy Aditya Ayithi, William G. Ryan, Dean Herbst
"For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o