Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Explosives Training Modules and Econex Approach

    By Fred C. Drury

    The Explosives Engineer's concern for personnel training in the safe, efficient and effective use of explosives materials has grown in recent years. Available training options have also grown. Today's

    Jan 1, 1981

  • ISEE
    Training and Licensing Requirements for Blasters

    By Stanley L. Lippincott

    A number of Federal and State agencies require formal training for blasters. Federal agencies often specify the need for initial training involving all job responsibilities as well as periodic refresh

    Jan 1, 1995

  • ISEE
    High Liability Blasting Techniques and Equipment

    By Gary B. Hemphill

    Each year the demand for precision blasting increases due to the reduction in the amount of prime land. More site preparation and hone building requires blasting than they did a decade ago, Because of

    Jan 1, 1978

  • ISEE
    Designing Blasts with Uncertainty and Tolerance

    By Calvin J. Konya

    When blasts are designed, we normally assume the best case situation. We assume that all burdens and spacings will be properly drilled, holes will be properly loaded, initiators will fire at the nomin

    Jan 1, 1990

  • ISEE
    Maximizing tunneling advance rate and explosive loading time at Atacama Kozan mine

    By Juan Pablo Henríquez, Sebastian Lozano, Constanza Soto, Gonzalo Segura, Carlos Torres, Danko Morales

    The Atacama Kozan underground mine, located in Tierra Amarilla, Atacama, Chile, was facing over-excavation and slow progress in drift construction, issues associated with the use of traditional explos

    Jan 26, 2026

  • ISEE
    Source Scaling of Single-Fired and Delay-Fired Explosions Constrained by In-Mine and Regional Seismograms

    By Brian Stump, D. Craig Pearson

    This work quantifies seismic coupling as a function of charge weight for single-fired (simultaneously detonated) explosions observed in the mine and at regional distances. These single-fired explosion

    Jan 1, 2002

  • ISEE
    Vibration and Air Blast Levels of Natural Phenomena and Normal Activities Compared to Levels of Blasting

    By Judy Konya Bowles, Calvin J. Konya

    Blast vibration and air blast are commonly blamed for damages to residential as well as commercial structures. Mining and construction companies are often required to spend monies in court defending t

    Jan 1, 1992

  • ISEE
    Controur Control blasting in Soft Rock Excavation

    By W. Jiao, Y. Yongqi, R. Shan

    Soft rock mines are distributed through out P.R.C. And drilling and blasting is still the main method of driving a tunnel in these mines. Traditional smooth blasting has been widely and deeply studied

    Jan 1, 2000

  • ISEE
    Electronic Blasting & Blasting Management - Past, Present & Future

    By Frank Hammelmann, Peter Reinders

    This paper briefly describes the past history of blast management. A modern blast management suite is then presented which demonstrates the current capability of the functional link between an electro

    Jan 1, 2004

  • ISEE
    Lake Dorothy, Alaska, Underwater Tunnel Piercing - The Norwegian Way

    By Jan Mehren, Arild Neby

    Underwater Tunnel Piercing or Lake Tap, often also called the Norwegian Method, will in many projects be an important part of the hydro electric development scheme. The very last blasting round in the

    Jan 1, 2009

  • ISEE
    A study of the ground vibration response to controlled blasts

    By J. -P. Tshibangu, E. Lefebvre

    ABSTRACT : The Tournai’s region in Belgium is characterized by outcrops of limestone that were mined out long ago by different companies for cement and crushed materials. The region is densely populat

    Jan 1, 2008

  • ISEE
    Applying Wireless Initiation System to Reduce Personal Risk Exposure and Optimize Blasting Sequence and Operational Cycle Time

    By Alejandro Berrios, Matheus DaSilva, Erick Siqueira

    Vazante mine is an underground polymetallic mine that produces zinc, lead, and silver, which belongs to Nexa Resources in Minas Gerais, Brazil. The mine, a sublevel stope underground mine, mainly appl

    Jan 21, 2025

  • ISEE
    Pyrotechnic Mortar Pressure and Exit Velocity Study

    By R. Sibley, K. Perry, E. McCorkle, M. Coy

    Black powder has been used in fireworks since the 10 th century in China. To this day, black powder still has a variety of uses, including fireworks, and remains relatively unchanged. Black powder is

    Jan 1, 2024

  • ISEE
    Computer Design and Field Application of Sub-Seam and Multi-Seam Blasts in Steeply Dipping Coal Seams

    Coal strip mine operators in Western Canada often mine steeply-dipping multiple coal seams in mountainous terrain. The ability to fragment the rock waste layers above and below these seams with minimu

    Jan 1, 1985

  • ISEE
    MINE AUTOMATION PROGRAM: Drill and Blast Analvsis

    By Lawrence Mirabelli, Wayne Lidkea, Mario Paventi

    On Januarv 1, 1996, INCO Limited, Tamrock OY, Dyno Nobel and CANMET formed a consortium for the development of robotic mining equipment called the Mining Automation Program (MAP). This project was a t

    Jan 1, 2001

  • ISEE
    A Blasting Agent Having Unusually Low Velocity and Producing Unusually Low Ground Vibration and Large Burden Displacement

    By D Linn Coursen

    Detonation propagates in the subject blasting agent at about 2.7 km/sec when it is heavily primed but explosion propagates in it at only about 0.43 km/sec when it is lightly primed. When propagating a

    Jan 1, 1994

  • ISEE
    The Largest Rock Fill Dam in the United States

    By L. L. Oriard

    he Metropolitan Water District of Southern California (MWD) supplies water to some 16 million people in a semi-arid region. Most of this water is imported. Some of the supply lines cross over the San

    Jan 1, 2000

  • ISEE
    Gurney’s Journey—pipe-bomb Fragments And Fumes

    By Michael Wieland

    The thrust of this report is to overcome some of the technical deficiency in the scientific methodology that correlates the work output during a charge explosion to the resulting toxic fumes. Thermody

    Jan 1, 2010

  • ISEE
    Prediction and Determination of Explosive-Induced Fracture

    By J R. Hearst, T R. Butkovich

    Explosive-induced fracturing and permeability enhancement far from a free face were studied. A one-dimensional computer program, SOC, was used to predict the total failure-associated distortional stra

    Jan 1, 1976

  • ISEE
    History and Expansion of the Panama Canal

    By R Frank Chiappeta, Eduardo Nixon, John Dean Smith, Tom Treleaven

    "The creation of the Panama Canal was far more than a vast, unprecedented feat of engineering. It was a profoundly important historic event and a sweeping human drama not unlike that of war. Apart fro

    Jan 1, 1998