Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Multiple Raise Round Blasting Technique

    By Dave I. McGregor

    The Multiple Raise Round Blasting Technique (MRRBT) is a safe, efficient, cost effective method of blasting thee will use existing mine personnel. The MRRBT, developed from the conventional 'drop rais

    Jan 1, 1994

  • ISEE
    Airdek: an Update

    By Michael D. McGill, John L. Turner, Don Sieger, Doyle Newhouse

    Since its introduction by Atlas Powder Company in late 1986 as a means of highwall stabilization in surface coal mines (1), applications of the basic AirDek (2) blasting technique have multiplied rapi

    Jan 1, 1991

  • ISEE
    Results of Blasting in Close Proximity to Water Wells at the Sleeper Mine

    By Roy Rose, Bruce Bowles, Wesley L. Bender

    Numerous large diameter water wells are used to dewater the pit at the Sleeper Mine. Occasionally, a well will be located inside the boundaries of a blast. Although one might expect that wells so loca

    Jan 1, 1991

  • ISEE
    Large Diameter Presplitting Improved Through Two Novel Techniques

    By GF Brent, Armstrong L. W

    It is recognised that presplitting is a special case in blasting which requires the reduction of conventional explosive pressures in order to avoid excessive rock damage. Two routes to achieving this

    Jan 1, 1998

  • ISEE
    Blasting a Very Big Boulder Under Adverse Conditions

    By Brad Johnson

    Homestake Mining Corporations' open cut operation at Lead SD. experienced a highwall failure in October of 1993. The failure released a 75' section of rock wall at the 5280' level. It came to rest on

    Jan 1, 1995

  • ISEE
    The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test Site

    By Don Larson, Gordon Coleman

    The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli

    Jan 1, 1994

  • ISEE
    Blasting Practices at the Fording River Operations

    By Murray B. Lytle

    The Fording River Operations of Fording Coal Ltd. in southeastern British Columbia is producing 45 million long tons of clean metallurgical coal for shipment to the Japanese steel industry on a 15 yea

    Jan 1, 1978

  • ISEE
    Underwater Pressure Recording: Industry Standardization

    By Thomas M. Keevin, Gregory L. Hempen

    Accurate assessment of blasting near an object (organism or structure) requires recording of the damage parameter for low-valued scaled distances. Seismograph recordings of particle velocity are a wel

    Jan 1, 1997

  • ISEE
    Underground Limestone Mining at the Portal-Access Okolona Quarry

    By William C. Pearson

    In past years, the usual justification for underground mining of limestone has been the depth of the overburden, perhaps 100 feet thick or more. At our Okolona Quarry in suburban Louisville, Kentucky,

    Jan 1, 1983

  • ISEE
    Problems with Malfunctioning Blastholes

    By Calvin J. Konya

    For proper blast design, one must make the assumption that all blastholes release nearly ideal energy. In many types of blasting operations, blastholes release very little useful energy. These blastho

    Jan 1, 1988

  • ISEE
    Borehole Deviation Study in a Long-Hole Stope

    By Paul Miller, Rene Laprade

    Does a 76 mm Ø hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initia

    Jan 1, 1998

  • ISEE
    Blasting to Initiate Block-Caving in Serpentine

    By Terry Matts, Henry Heidrich, Cluny Randell, Carl Kottmeier

    Until 1990, all production of asbestos ore at Cassiar was by open-pit methods. With the impending exhaustion of open-pit reserves, a decision was made in February 1988 to continue mining underground,

    Jan 1, 1992

  • ISEE
    Quantifying the Probability of Detonator Timing Overlap in Surface Mine Blasting by the Application of Monte-Carlo Simulations to Initiation Plans

    By Rob Farnfield

    The control of vibration from surface mine blasting by the application of detonator (cap) delay techniques has been universally accepted for many years. For almost as long it has been known that, for

    Jan 1, 1999

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996

  • ISEE
    Application of Credible Seismic Methods in the Design of an Optimum Blast Round

    By Charles W. Trettel

    Confined explosives upon detonation produce a chemical reaction generating expanding gases that result in fragmentation of matrix a chemical to mechanical transition. A 100% energy conversion during t

    Jan 1, 1975

  • ISEE
    The Challenge of Florida Blasting

    By George Pittman, Dan McCutchen

    When an explosive manufacturer in the USA wants to put a new explosive formula or detonator design in the toughest proving ground in North American, it is Florida. Florida conditions have baffled many

    Jan 1, 1995

  • ISEE
    Blasting 250 Feet from a Historic Structure

    A case history is presented where a variance was permitted by the court to change a 500 foot limit to 250 feet for blasting overburden at a surface coal mine in the proximity of a historic structure.

    Jan 1, 1991

  • ISEE
    Delicate Demolition - Bizarre Tragedy Leads to Record-Setting Blast in Canada

    By Brent Blanchard

    An emergency demolition project related to a bizarre plane crash has reportedly set a new world record for the tallest structure ever explosively demolished. On Sunday, April 22, 2001, 38-year old Gil

    Jan 1, 2002

  • ISEE
    Fracturing Composition Using the Gas Pressure Generated by the Thermit Decomposition Reaction

    By Yoshihiro Moriyama, Toshihiro Okitsu, Ryouichi Banno

    The fracturing composition using the gas pressure generated by the thermit decomposition reaction gives the following performances.

    Jan 1, 1995

  • ISEE
    Shipping Ammonium Nitrate for the Cerrejon Coal Project Colombia, South America

    By A Gene Riggs

    The Cerrejon Coal Project in Colombia, South America is one of the largest coal mines in the world. The mine is located in northeastern Colombia on the La Guajira penninsula. The area is in a remote v

    Jan 1, 1984