Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting for Avalanche Control Above Snoqualmie Pass and Chinook Pass in Washington State

    By Craig Wilbour, John Stimberis, Rob Gibson, Lee Redden

    An avalanche is a snow slide. A simple explanation is that the snow on a slope will slide (avalanche) when the snow strength can no longer support its own weight. Snow avalanches happen when the load

    Jan 1, 2004

  • ISEE
    The Importance of the Explosive Confinement

    By Manuel Gutkrrez, Nasslo Gallardo, Arturo Cancec

    The study done in Dofia In&s de Collahuasi aims to improve the fragmentation in one of the most difficult rocks to deal with in an operation, It is the Ignimbrita. In order to avoid ejections and to i

    Jan 1, 2001

  • ISEE
    Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed Video

    By Italo Onederra, Miguel Araos

    "In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test

    Jan 1, 2017

  • ISEE
    Detonation Line Standards and Specifications-Someday?

    By James A. McGrath

    "The predominant key word associated with all commercial blasting methods is “safety”. Safetyshould take precedent over all other aspects of the entire explosives industry which on a wholehas had an e

    Jan 1, 1999

  • ISEE
    Hybrid Specifications for Underwater Blasting Specifications on the Soo St. Marie Channel Deepening

    By Timothy Smith, Matthew Ryan, Dr. Anthony Konya

    Hybrid specifications are a relatively new style of specifications specifically for the drilling and blasting industry that has seen widespread use over the last decade with the U.S. Army Corp of Engi

    Feb 1, 2020

  • ISEE
    Practical Aspects of GPS Positioning and Equipment Monitoring Technology in Drilling and Blasting

    By Carl Hendricks

    Aquila Mining Systems Ltd., is the world leader in drill monitoring, control and GPS-based machine navigation systems for the mining industry. This paper will review the design and application of AQUI

    Jan 1, 2000

  • ISEE
    Expan - Ammonium Nitrate Prill for Blasting, Technical Aspects and Applications

    By Tjaar A. Louw, Albert P. Van Niekerk, Johannes J. Louw, Attie J. Goosen

    Unlike molecular high explosives, commercial explosives based on ammonium nitrate do not detonate ideally according to the theoretical model for steady state, one-dimensional detonation. One of the re

    Jan 1, 1997

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    The paper presents new results from Datacloud during recent Seismic While Drilling trials in iron ore, metallurgical coal, and hard rock mines around the world. The measurements are compared with wire

    Feb 1, 2020

  • ISEE
    Modeling Vs. Monitoring Blast Movement: The Cost of Variation

    By Will Hunt, Darren Thornton

    In March of 2013, an undisclosed gold mine (MINE X), located in the Western United States, performed blast movement monitoring of three blasts occurring in one of two active pits. Blast Movement Monit

    Jan 1, 2014

  • ISEE
    Ammonia (NH3) in blasting fumes – origin and measurement

    By Peter Moser, Michael Messner, Florian Bauer

    The existence of ammonia in underground blasting fumes was frequently measured in various field tests (6, 7). Ammonia in fumes with a TLV (threshold limit value) of around 30 ppm (slightly different i

    Jan 1, 2010

  • ISEE
    Preblast Surveys and a Look at Today's Seismographs: A General Look

    By Randall M. Wheeler

    Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a

    Jan 1, 1992

  • ISEE
    Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation

    By Dale Preece

    A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would

    Jan 1, 2006

  • ISEE
    Blasting to Reduce Ore Dilution - Are You Kidding?

    By Brad Bulow

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation. Some dilution of any ore present is the inevitable result. This makes blasting a dirty word to mo

    Jan 1, 2000

  • ISEE
    Ignition and Growth Reactive Flow Model for Aluminized Emulsion Explosive

    By Ulf Nyberg, Changping Yi, Daniel Johansson, Håkan Schunnesson

    To investigate the non-ideal detonation properties of aluminized emulsion explosive, a series of tests for an emulsion explosive with 5% aluminum powder additive were carried out with mortar confineme

  • ISEE
    Energy Factor Based Selection of Site Mixed Slurry Explosives for Limestone Mines of India

    By Satish Kate

    Indian limestone mines which are highly mechanized in operation and supply limestone to the cement plants have been quite successful in devising ways and means to optimize blasting parameters, so as t

    Jan 1, 2006

  • ISEE
    Novel Emulsion Explosives Technology and Application

    By Dale Ramsey

    Emulsion explosives have become the product of choice for many blasting applications and are not limited to just extreme wet hole conditions or special application environments as in the past. Today’s

    Jan 1, 2000

  • ISEE
    Evaluating Airblast Damage Complaints

    By Lawrence W. Gubbe

    Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most

    Jan 1, 2004

  • ISEE
    Planning to Demonstrate Why High PPVs Work for Close-In Blasting

    By Chris Breeds, Larry Leone, Jerry Wallace

    Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str

    Jan 1, 2010

  • ISEE
    Mitigation of Loading on Floor Boards in Light Armored Vehicles Subjected to Explosive Loading

    By Robert Benedetti

    This paper describes various mitigation methods in order to reduce the maximum acceleration of the floorboard of hulled vehicles when explosive charges buried in water saturated sand were detonated be

    Jan 1, 2012

  • ISEE
    Application of New Explosives Technologies in Australian Conditions

    By Alastair C. Torrance

    "A brief review of the Australian mining industry is given followed by a more detailed treatment of a study of the influence of primer Size on explosive performance. This is based on a joint research

    Jan 1, 1991