Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automating A Sand And Gravel Plant ? HistoryBy Paul G. Mahoney
The original Radum aggregate plant, built by Henry Kaiser in 1931, is the oldest of the nearly 200 individual operations established by the Kaiser companies. Since that time it has been producing aggr
Jan 1, 1970
-
Methods To Improve Mine Ventilation System Efficiency - Introduction - Preprint 09-070By C. Pritchard
John Marks said in his acceptance of the Hartman Award in 2008 ? ?I guess that without the occasional complaint, your mine is probably over-ventilated? (Marks, 2008). Miners are seldom in this situati
Jan 1, 2009
-
Diesel Aerosols in an Underground Coal MineBy Jared Winkler, Jon A. Hummer, Aleksandar D. Bugarski, Shad Peters, Steven E. Mischler, Steve Cochrane, Shawn Vanderslice, Teresa Barone
The case study assessed submicron aerosols at a continuous miner (CM) section, diesel aerosol concentrations at the longwall (LW) section, and elemental carbon (EC) and total carbon (TC) exposures. Ae
Mar 16, 2022
-
Heavy Minerals Activity On The Rise WorldwideBy William R. Yernberg
The Fifth International Heavy Minerals Conference (HMC) was held Oct. 16-19, 2005, at the Marriott Sawgrass Resort in Ponte Vedra, FL. With SME as sponsor, the 2005 conference marked the first time th
Jan 1, 2006
-
Ductile Shotcrete Linings for Mining in “Squeezing Ground Conditions”By Thomas Fiest, Helmut Wannenmacher, Wulf Schubert, Manuel Entfellner
Mining and tunneling in so-called “squeezing ground conditions” at high in-situ stress can result in substantial and enduring ground deformations. The magnitude of deformations is closely tied to the
Jun 25, 2024
-
TBM Tunneling At The Ashlu Hydropower Project, Squamish, BCBy Serge Moalli
The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4
-
High Pressure Filtration of Molybdenum Concentrate Meets Low Moisture Requirements without Thermal DryingBy Brenda J. Wolfe
Following successful laboratory and pilot plant investigation of dewatering characteristics of molybdenum concentrate produced by a Chilean copper/moly producer, two (2) DENVER SALA 500 Series Tube Pr
Jan 1, 1995
-
An Overview Of New Surface Mining Methods Of Steep Slopes In The Appalachian RegionBy Ben E. Lusk
First of all let me say what a genuine pleasure it is to be here. Acapulco certainly is a beautiful change. I'm going to spend sometime talking about change, because frankly I'm astounded at
Jan 1, 1974
-
Kinetics Study on the Leaching of Copper from Calcification Roasting Copper Refining Slag Using Waste Acid - Mining, Metallurgy & Exploration (2023)By Rui Xiang Yang, Cong Li, Jia Zeng, Rong Liang Zhang, Wei Zhang, Chao Fan Tang
This research took the roasted products obtained by leaching copper (Cu) refining slag using waste acids and roasting leaching residues with calcium oxide (CaO) as raw materials and used oxidative lea
Jan 11, 2023
-
Cobalt Recovery from Mill Tailings at Mantoverde Copper Mine - SME Annual Meeting 2025By Peter Amelunxen, Kain Nugent, Brandon Akerstrom, Willem Duyvesteyn, Todd Harvey
In 2024, Capstone Copper Corp commissioned a new sulfide flotation plant at Mantoverde in the Atacama region of Chile to process copper ore at a design rate of 32,000tpd. The pyrite associated with th
Feb 1, 2025
-
Development Of Mini Pilot Plant And Its Application In Milling OperationsBy D. Shink
A small scale continuous flotation cell was designed and constructed at Noranda Technology Centre to develop a mobile testing flotation circuit located next to the production circuit. This mobile smal
Jan 1, 1992
-
Thirty Years Experience In Applying Rock Mechanics To Roof Control In Coal MiningBy Charles T. Holland
INTRODUCTION Insofar as I am aware, the term rock mechanics was not in the English dictionary in 1930 when I started my graduate program at West Virginia University. Hence, I never thought that I was
Jan 1, 1971
-
The Price Is Right?Planning Large Water Tunnel Contracts In New YorkBy Christian Maguire
Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure
-
Towards Sustainable Development: Conflict Management Practice and EducationBy E. McCullough
"Fostering positive community relations is a principal tenet of sustainable development, but conflict can test even the strongest of relationships. While conflict surrounding resource development proj
Jan 1, 2016
-
Hydraulic Backfilling -- A Method Of Ground SupportBy Frank A. Jerabek
Problems of mine backfilling and fill material deposited underground, the characteristics and relationship between the deposited fill material and overlying ground, and the practical applications and
Jan 1, 1965
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels ProjectBy Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Penalty Element Metallurgical Amerlioration By Automated Mineralogy: Progress Towards A Deportment Of Fluorine In The Grasberg, Dmlz And Block Cave Mines, Papua, Indonesia - SME Annual Meeting 2022By W. A. Mathews
We report on the progress of an automated mineralogical deportment of fluorine (F) in two portions of the Grasberg District for the development of metallurgical amelioration protocols for Cu sulfide c
Mar 2, 2022
-
Special Report : Mineral Investment 1983 Depends on PricesBy Franklin J. Stermole
The current financial state of the mineral industry, in general, is bad. Economic prospects for improvements in the near future are uncertain. What will improve mineral investment economics so the min
Jan 2, 1983
-
A Methods for the Evaluation of Data From the Batch Testing of Green PelletsBy John S. Wakeman
The initial step in the pelletizing of iron ores is the production of green balls. The importance of this step cannot be overemphasized as the physical quality of the green balls has a very significa
Jan 1, 1971
-
Evaluation Of Washery PerformanceBy L. Valentik
Many attempts have been made during the last forty years to evaluate the performance of gravity separation equipment, that is, the effectiveness with which light and heavy particles are separated. The
Jan 1, 1968