    Stochastic optimization for long-term planning of a mining complex with in-pit crushing and conveying systems

    By Roussos Dimitrakopoulos, Liam Findlay

    Semimobile in-pit crushing and conveying (IPCC) systems can help reduce truck haulage in openpit mines by bringing the crusher closer to the excavation areas. Optimizing a production schedule with sem

    Nov 1, 2024

  • SME
    Miner Bit Geometry And Its Effect On Production Costs

    By C. G. Snavely

    Martin County Coal Corporation produces coal from seven continuous miner sections in two coal seams which are often interlaced with rock partings. Because of high clay content and coal oxidation, all

    Jan 1, 1985

  • SME
    Short-Delay Blasting At Anaconda's Berkeley Open-Pit Mine, Montana

    By Lewis L. Oriard

    The authors outline the development and application of blasting methods put into use 11 years ago at the Berkeley Open-Pit Mine, Butte, Montana. The blast design uses a very short delay (5 millisecond

    Jan 1, 1980

  • SME
    Case Study of Path Dependent Calibration and Pillar Stability Analysis Using the LaModel Program

    By Morgan M. Sears

    The LaModel program is widely used to calculate stresses and displacements on thin tabular deposits, particularly when multiple seams or complex mining geometry is encountered. The program itself allo

    Jun 25, 2024

  • SME
    A Computer Simulator For Dynamic Analysis Of Mineral Processing Circuits

    By G. T. Adel

    The application of automatic control to mineral processing operations has been gaining momentum during recent years. Many strategies are being developed for controlling crushing, grinding and flotatio

    Jan 1, 1983

  • SME
    Simplified DC Crane Control

    By Charles C. L. Smith

    A review and comparison is made of the circuitry utilized for dc crane control systems. Anti-parallel three phase full wave thyristor bridges for dc motor reversing and speed control are compared with

    Jan 1, 1973

  • SME
    Efficiency Sizing Of A Vibrating Screen

    By V. K. Karra

    An improvement in the present day screen sizing methods calls for knowledge on i) how material in the size range: 0.5 x 1.5 times the through-fall opening of the mesh on a deck, splits between the ove

    Jan 1, 1979

  • SME
    Rapid Development Of Longwall Retreating In The Submarine Area Of The Sydney Coal Field Of Nova Scotia

    By L. Frost

    The establishment of a retreat system of longwall mining in this submarine coal field has been under study for many years and, although in special cases there have been limited local applications of t

    Jan 1, 1964

  • SME
    Effect of Casing Cementing Alternative on Shale Gas Well Casing Deformations Induced by Longwall Mining

    By Peter Zhang, Daniel Su, Bo Hyun Kim

    Shale gas wells drilled in longwall chain pillars are influenced by longwall mining. Longwall mining on each side of the chain pillars can create overburden movements and induce deformations in gas we

    Jul 1, 2023

  • SME
    The Fifth Dimension In Ore Search - Introduction

    By Peter Joralemon

    I want to limit my remarks to epigenetic ore deposits, but do not necessarily subscribe to the classic theories of hydrothermal ore deposition. I will consider an epigenetic deposit as a primary depos

    Jan 1, 1967

  • SME
    Evaluation of 3D FE Predictions of Ground Movements Caused by EPB Tunneling in Stiff Clay

    By Vasiliki Founta, Andrew J. Whittle

    "This paper describes the development of a 3D finite element model for predicting ground movements caused by construction of 7.1 m diameter twin bored tunnels for the Crossrail project in London using

    Jan 1, 2016

  • SME
    Assessment of EPB Soil Conditioning on Two TBMs by Using Apparent Density

    By Ehsan Alavi, Glen Frank, Michael DiPonio, Mike Mooney, Lisa Mori

    "A study was conducted on the N125 project in Seattle to investigate the use of apparent density as an assessment tool for the effectiveness of soil conditioning. The formation of an air bubble as wel

    Jan 1, 2016

  • SME
    Size Specific Flotation Concept - A Case Study On Porphyry Copper Ore

    By J. Kallioinen

    The paper describes industrial size experiments with a 100 m3 flotation cell validating the Size Specific Flotation concept and the Tank Cell design. It discusses some variables affecting the flotatio

    Jan 1, 1995

  • SME
    Horizontal Drilling Technology For Advance Degasification ? Introduction

    By P. C. Thakur

    Horizontal drilling in coal mines is a relatively new technology. The earliest recorded drilling in the United States was done in 1952 at the Humphrey Mine of Consolidation Coal Company for degasifica

    Jan 1, 1979

  • SME
    Laboratory Evaluation Of Sodium Sulfide Injection To Facilitate Restoration Of In Situ Leached Uranium Ore Zone (12e4f5b9-73ec-4d36-86f4-b19256e5be9b)

    By W. J. Martin

    At the termination of mining, the quality of ground water in the ore-zone aquifer must be returned to a condition predetermined by the permitting agency. To immobilize the redox-sensitive elements (e.

    Jan 1, 1986

  • SME
    Stability Evaluation During Bench Cut-And-Fill Mining Of The B-Neath Zone At The Cannon Mine

    By C. E. Brechtel

    Bench cut-and-fill stopes with heights between 85 and 105 ft are being excavated in the lower levels of the B-NEATH Zone. Estimates of pillar strength and pillar loading indicated a high probability o

    Jan 1, 1989

  • SME
    Magnetic Recovery Of Germanium Sulphide With The Franz Ferrofilter ? The Kipushi Deposit

    By M. A. Bouchat

    The Kipushi deposit, where the Prince Leopold Mine has been installed, belongs to Union Miniere du Haut-Katanga and is located in the Belgian Congo, 20 miles SW of Elisabethville, at the vicinity of t

    Jan 1, 1960

  • SME
    Statement Of Principles (642b76fe-53e4-4371-8daf-b46af62c4a92)

    By L. W. Swent

    Dr. Emrick, honored guests, distinguished speakers, ladies and gentlemen, I am Langan Swent, Vice President for Environmental Affairs and Occupational Safety and Health, of Homestake Mining Company. T

    Jan 1, 1981

  • SME
    Disaster Averted After MTBM/Active Gas Main Collision - Utilizing Captivating Case Histories to Educate Stakeholders with Regards to Tunneling in Urban Environments

    By Rory P. A. Ball, Mark Briggs, Martin Dix

    "Tunnel professionals should inform project stakeholders on the reality that tunnel projects are not 100 percent devoid of the need for excavations or public inconveniences during both design and cons

    Jan 1, 2016

  • SME
    Calibration Of The J-TEC Vortex Shedding Anemometer Located In A-Left Spur At The CSM Experimental Mine

    By J. D. Cooper

    Previous research developed guide- lines to restrict the placement of air velocity sensors to areas of Low turbulence in underground nines. Even though these guidelines are theoretically correct, and