Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Key Technologies of Integration of Coal Mining–Gangue Washing–Gob BackfillingBy Wei Yin, Yu Wu, Xiexing Miao
"For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in
Jan 1, 2015
-
A History of Bock Burst Research in the Coeur D'Alene Mining DistrictBy Michael Jenkins
This paper reviews the history of rock burst research in the Coeur d'Alene Mining District of northern Idaho over the last 30 years. Rock bursting is a problem because of a combination of geologi
Jan 1, 1987
-
Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension ProblemBy Guy Reed, Russell Frith
"Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h
Jan 1, 2017
-
Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump SusceptibilityBy Arthur Miller, Andrew Weakley, Heather E. Lawson
"IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the
Jan 1, 2015
-
Potential Problems Related To Mining Under Or Adjacent To Flooded WorkingsBy Stanley J. Michalek
Good planning is critical to operating a safe and efficient mining operation. As the shallow coal scams become depleted, attention turns toward deeper mineable seams or remnant coal reserves. It is be
Jan 1, 2000
-
Highwall Stability Implications from Longwall Mining at Broadmeadow MineBy Bob Coutts, Matt Martin, Dan Lynch, Dan Payne
"The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th
Jan 1, 2018
-
Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal MiningBy Andre Zingano
It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove
Jan 1, 2011
-
Numerical and Physical Modeling as Planning Tools for Rockbolted RoadwaysBy Peter Griesenbrock
In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo
Jan 1, 2002
-
A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine RoofBy Syd Peng
In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l
Jan 1, 2005
-
Evaluating Roof Control In Underground Coal Mines With The Coal Mine Roof RatingThe U.S. Bureau of Mines (USBM) has developed the coal Mine Roof Rating (CMRR) to aid in ground control. This paper describes the application of the CMRR at four coal mines operated by a major U.S. co
Jan 1, 1994
-
Statistical Characterization Of Coal-Mine Roof Failure: Suggestions And Case StudyBy Alan D. Smith
[A standardized checklist in a questionnaire format, was established to investigate selected factors associated with coal nips roof falls, as derived from an intensive review of the literature. A plot
Jan 1, 1984
-
Effect Of High-Extraction Coal Mining On Surface And Ground WatersBy Francis S. Kendorski
High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ
Jan 1, 1993
-
Stress Measurements for Safety Decisions in Longwall Coal (4b24fd83-539f-4e52-8928-06b50544afce)By Eric Zahl
Researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health, Spokane, WA, have collaborated with three Western longwall coal mines in an ongoing effort
Jan 1, 2002
-
A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)By Frederick Carr
1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote
Jan 1, 1982
-
Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)By Daniel W. H. Su
This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan
Jan 1, 1987
-
Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of WeaknessBy Daniel W. H. Su
Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr
Jan 1, 1990
-
New Approach to Evaluate the Stability of Yield PillarsBy Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
Meeting the Challenges of Floor and Sidewall Strata Control in UK Deep Coal MinesBy Lorraine Kent
Excessive floor and side deformation are major problems in deep coal mine entries in Europe, and in particular in the UK where rockbolt support is used at depths of working of around 3000 ft. This has
Jan 1, 2014
-
Determination of the Optimum Crown Pillar Thickness between Open Pit and Block CavingBy Kourosh Shahriar, Kazem Oraee, Ezzeddin Bakhtavar
"In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic cons
Jan 1, 2010
-
Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)By S. Bensehamdi
An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur
Jan 1, 1992