Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)

    By Chris Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand

    Jan 1, 2002

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • SME-ICGCM
    Computer Modelling And In Situ Instrumentation Techniques: A Quantitative Approach To Scientific Mine Design

    By Bruce H. Gardner

    This paper describes the application procedure of the Stress Control mine design method. This procedure has evolved over the past 20 years of the practice of this Method in trona, potash, salt, and, m

    Jan 1, 1984

  • SME-ICGCM
    Enhancing Mine Subsidence Prediction and Control Methodologies

    By Michael Karmis

    During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm

    Jan 1, 2008

  • SME-ICGCM
    Development and Application of Impact-Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

    By Kevin Jinrong Ma

    Underground mines often experience roof falls in entries, crosscuts, and intersections of active mining sections, main travel ways, and belt entries. Roof fall heights greater than 20 ft (6 m) make re

    Jan 1, 2011

  • SME-ICGCM
    Ground Deformation In The Case Of Underground Mining Of Thick And Dip Coal Seams In The Jiu Valley Basin

    By Gheorghe Oncioiu

    The phenomena developed on the influence of thick coal seam no.3 mining, by horizontal slices and rocks caving roof control, in the Jiu Valley coal basin, are very complex. By analyzing the influence

    Jan 1, 1999

  • SME-ICGCM
    Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case Study

    By Danny J. Van Roosendaal

    An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain

    Jan 1, 1995

  • SME-ICGCM
    Numerical Modeling of the U1A Complex at the Nevada Test Site: Model Development and Comparison of Different Drift Mining Options (9c46cc37-c6f9-43fc-b6b3-b63cc79f203c)

    By R. Karl Zipf

    Stress analysis programs such as MULSIM/NL, LAMODEL, MinSim 2000, and EXAMINE TAB are used in the mining industry to analyze stresses and displacements in coal mines, platinum mines, gold reefs, and t

    Jan 1, 2003

  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Advancements In Reflective Seismic Tomography For The Location Of Old Works And Characterization Of Structural Anomalies Impacting Underground Developments

    By David R. Hanson

    Seismic tomographic imaging, based on the same principles as a medical CAT Scan (Computer-Aided-Tomography). has been used for many years in the oil industry for large-scale subsurface stratigraphic c

    Jan 1, 2000

  • SME-ICGCM
    A Method For Estimating Western Coal Strengths From Point Load Tests On Irregular Lumps

    By K. Y. Haramy

    This report describes the development of an equation for predicting the crushing strength of 2-inch (5.08-cm) cubes of coal from point load tests made on irregular lumps. The equation was developed fr

    Jan 1, 1982

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Seismic Events Due To Underground Mining Activities

    By R. Fritschen

    In order to investigate locations, source parameters, and source mechanisms of mining induced seismic events, a local network of seismic stations was installed at a coal mine in the eastern part of th

    Jan 1, 1999

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Alternatives For Controlling Cutter Roof In Coal Mines

    By Nicholas P. Kripakov

    The unpredictable massive collapse of roof in openings developed under apparently safe and stable roof conditions in coal mines of the United States has been of much concern for many years. One type o

    Jan 1, 1982

  • SME-ICGCM
    Applications Of Cement Grouting Method For Controlling Weak Strata

    By Herryal Z. Anwar

    In recent years, many both mining and civil engineering projects are developed in the area which may be categorized unstable, such as fractured and jointed rocks or "water sensitive rocks". For exampl

    Jan 1, 2000