Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Longwall Roof Fall Prediction and Shield Support Recommendations

    By Ulrich Langosch

    In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields

    Jan 1, 2003

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Hydraulic Fracturing Of Sandstone And Longwall Roof Control - Implementation And Evaluation

    By D. W. H. Su

    Following a roof fall in the B12 headgate of a CONSOL Pennsylvania Coal Company (CCPC) underground coal mine in February 1998, CONSOL R&D and Exploration initiated an underground roof geology reconnai

    Jan 1, 2001

  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Downhole Overcoring Stress Measurement at a Western Underground Coal Mine

    By David Conover

    Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal

    Jan 1, 2004

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Support Selection For The Multi-Lift Mining Method

    By Claude A. Goode

    Large quantities of high grade coal exist in thick seams in the United States. Many of these thick seams are too deep to be surface mined and do not lend themselves readily to underground extraction.

    Jan 1, 1981

  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Roof Screening: Best Practices and Roof Bolting Machines (e5909744-6953-4a41-b02f-21226966b63f)

    By Susan Robertson

    Many injuries are caused each year by rock falls in coal mines. Most of these injuries are not caused by major roof collapses, but from falls of smaller rocks from the immediate top or roof skin. Vari

    Jan 1, 2002

  • SME-ICGCM
    Acoustic Scanner Analysis of Borehole Breakout to Define the Stress Field Across Mine Sites in the Sydney and Bowen Basins, Australia

    By S. MacGregor

    The role of horizontal stress, its orientation and magnitude, in defining the behaviour of strata in underground coal mines has been well established. Poor panel layouts have led to gate end stress co

    Jan 1, 2002

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992