Search Documents

  • SAIMM
    Contributors to Fatigue at a Platinum Smelter in South Africa

    By J. Pelders, G. Nelson

    "Fatigue is a significant concern in the mining industry as it is a causal or contributing factor in many incidents and accidents. Fatigue can be caused by work- and non-work-related factors. There is

    Mar 1, 2019

  • SME-ICGCM
    Supporting Method of the Bolted Strata in Large Deformation Roadways

    By Shuangsuo Yang

    Based on field observations and physical modeling of simulated materials, the dynamic equilibrium principle on the whole interaction process between the surrounding rocks and support of large deformat

    Jan 1, 2005

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • NIOSH
    IC 7814 Phosphate Rock (In Two Parts) 1. Mining, Beneficiation, And Marketing - Summary And Introduction

    By E. Robert Ruhlman

    ["Phosphate rock" is a broad term applied to natural deposits of minerals valued chiefly for their phosphorus content. More specifically, phosphate rock may be defined as a natural rock containing one

    Jan 1, 1958

  • CIM
    The Effect of Fixed Work on Incentive Rates

    By Douglas A. Sloan

    AN INCENTIVE or bonus system of payment is commonly used for mine labour. The incentive rates are usually based on the variable units of production, such as dollars per foot of drift advance or cents

    Jan 1, 1958

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Experimental Studies in the System PbS-FeS-ZnS-(Ag2S) at 1 Atmosphere to 27 Kilobars: Implications for the Broken Hill Orebody

    Experimental petrology may be used to accurately constrain PTX conditions in order to calibrate and understand geologic processes. This method may be used to answer postulated questions, by recreating

    Jan 1, 1998

  • AUSIMM
    Improved Ventilation and Dust Capture in Underground Crushing Plants

    By S W. Kingman, D Whit, I S. Lowndes

    The use of compressive crushing equipment such as gyratory crushers within minerals processing plants can potentially generate large quantities of dust. Remedies to this problem include the retrofitti

    Jan 1, 2005

  • AUSIMM
    Some Aspects of Rank Variation and Utilization of Coal

    The proper selection of a coal for a particular use depends on knowledge of fundamental data concerning the coals that offer, particularly their type and rank. Type of coal depends on the nature of th

    Jan 1, 1955

  • NIOSH
    RI 3116 A Study of the Properties of Texas-New Mexico Polyhalite Pertaining to the Extraction of Potash

    By N. Fragen, H. H. Stroch

    "INTRODUCTION A previous paper by H. H. Storch 4 described. three processes for the production of potassium sulphate from polyhalite (K2S01.MgSO1.2CaS04.2H2o), Since these processes depended upon calc

    Sep 1, 1931

  • SME
    Nonlinear Adaptive Control Of Mineral Processes

    By P. Massacci

    The modelling of phenomena by nonlinear dynamic Systems Theory representations require the specification and identification of suitable models of the phenomenon and the availability of good optimizati

    Jan 1, 1991

  • SME
    The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery Relationship

    By J-P Franzidis

    A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu

    Jan 1, 2000

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part II: Modeling and Interpretation

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract - MEGATEMII airborne electromagnetic data collected over the Iso and New Insco massive sulfide deposits have been modeled using three modeling packages. The EMQ package is a quick inversion

    Jan 1, 2006

  • ISEE
    Applied to a High Risk Case History

    By C Agreda

    The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di

    Jan 1, 2005

  • SAIMM
    Effect of HPGR grinding on pelletizing performance of coarse magnetite concentrate-microstructural studies, L. Hosseini, R. Hejazi, M. Saghaeian, and M.V. Sheikhzadeh

    By M. Saghaeian, R. Hejazi, L. Hosseini, M. V. Sheikhzadeh

    Blaine number has long been used to evaluate the pelletising ability of iron concentrate in the industry. Much information and practical data are available about the effect of Blaine number on pelleti

    Jan 1, 2020

  • SME
    73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H

    By Brent Duncan, Doug Harding, Bob Stier

    The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi

    Jan 1, 2003

  • SME
    Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024

    By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans

    Jun 23, 2024

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • SME
    Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.

    By V. Galla

    Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding

    Jan 1, 2011

  • AIME
    The Conference Department At Lehigh University.

    By Henry S. Drinker

    (Canal Zone Meeting, November, 1910.) FEW men reach middle life without having had the experience of failure in one or more undertakings; and most of us can look back with gratitude to help or advice

    Jan 1, 1911