Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Black Mountain – An Overview - The Resolution Of The Lands Unsuitable Petition From The Legal And Technical PerspectivesBy M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner
In 1998, Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903 +/- hectares (22,000 +/- acres) o
Jan 1, 2000
-
Concentrate Dewatering Modernization at the INCO Thompson SmelterBy Mika Muinonen
"Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou
Jan 1, 2006
-
Thought Processes During The Project Initiation PhaseBy H. Griesel
The overall supply of platinum is forecast to rise more than the demand, and market deficit will narrow somewhat, but is still substantial at about 480 000 ounces. Because of this deficit, the price o
Jan 1, 2004
-
Criteria for the Selection of a Recycling Process for Low Zinc-Containing Residuals f.rom the Iron I Steel IndustryBy N. L. Piret
Reprocessing of low zinc-bearing residuals with a zinc content of less than 10%, originating from the iron and steel industry, has been given more and more attention in the last few years, due to the
Jan 1, 1992
-
Large Diameter Machine Bored Piles In AustraliaBy W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Diversity and Technology take Center Stage at the 2019 SME Annual Conference & ExpoBy Georgene Renner, Chee Theng, William Gleason
"A walk through the exhibit hall or a glance at the technical programing that was offered at the 2019 SME Annual Conference & Expo and CMA 121st National Western Mining Conference in Denver, CO, Feb.
May 1, 2019
-
Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper ConcentratorBy G. Cordingley, A. Mwanza
Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an
Jan 1, 2014
-
IC 6130 The Unusually Good Safety Record Of A Coal Mine And Of A Coal-Mine ForemanBy E. H. Denny
A most interesting safety record has been made by the Colorado Fuel and Iron Co. s. Robinson ho. 1 mine located at Walsen, Cola. Mr. J. L. McBrayer has been superintendent of the Robinson No. 1 and 2
Jan 1, 1929
-
Managing steep seam dips and floor shears related dragline bench and lowwall instabilitiesBy J Li, J Regan, D Payne
The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge
Nov 29, 2022
-
Rock Classification For Portal DesignBy G. K. Rogers
The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at
Jan 1, 1989
-
An Investigation on Processing Characteristics of Gold Ore Samples from Barry Deposit, QuebecBy S. Kelebek, E. Yalcin
"Two composite samples of a gold-bearing ore from North Western Quebec (Barry Township) were tested to assess their grindability, recovery by flotation and Knelson concentrator as well as extraction u
Jan 1, 2008
-
Diesel Power in the Canadian Mining IndustryBy J. Ander
About fifteen years age some mines in western Canada commenced using Diesel engines, partly for development work but also for operations on quite a large scale. In the Eastern mining field, the Diesel
Jan 1, 1930
-
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric FieldPipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Sep 13, 2010
-
American Practice In Design And Installation Of Driven Piles For Structure SupportBy Hal W. Hunt
Heavier loading and more efficient equipment is helping to keep driven piles competitive in America. Better Knowledge and testing of soils and support materials make it practical to use higher stresse
Jan 1, 1987
-
Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)By Andrzej Walentek
This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac
Jan 1, 2009
-
Gold mineralization in porphyry copper deposits discussedBy David J. Lowell
The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe
Jan 1, 1989
-
Performance Of A Soft Ground Tunnel On The Washington MetroBy Edward J. Cording, William H. Hansmire
INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr
Jan 1, 1997
-
Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimizationBy L. Chunpongtong
ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents
Jan 1, 2014
-
Determining the oil sands mining limit with Lerchs-Grossmann optimizationBy L. Chunpongtong
The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema
Jan 1, 2014
-
OFR-118-85 Development Of Self-Contained Self-Rescuer And Enhanced Electrical Hazard Training MaterialBy Michael J. Klishis
It was the goal of this project to develop training materials specific to two areas of the mining industry: (1) safe use and care of the self-contained self-rescuers, and (2) awareness and avoidance o
Jan 1, 1985