Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Case History of a Mixed Ground MicrotunnelBy D. Craig Camp
conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT
Jan 1, 2001
-
Case History of the Corridor Orebody, Mount Lyell, TasmaniaBy McKenzie A. M
The Corridor ore body is so named because it occurs in an east-west zone or corridor of schist bounded on the north by the siliceous conglomerates of Mount Lyell, and on the south by similar conglomer
Jan 1, 1961
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e
Jan 1, 1995
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed
Jan 1, 1995
-
Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal StressBy D. Oyler
The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And StationsBy Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT StationBy Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DCBy Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Case History Of The Wachovia?Knight Theater Pedestrian TunnelsBy Eric Eisold
The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CABy Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
Case History: Foundations For The New Mississippi River Bridge, St. LouisBy Paul J. Axtell
This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c
Jan 1, 2011
-
Case History: Multiple Axial Statnamic Tests On A Drilled Shaft Embedded In ShaleBy Paul J. Axtell
Two new railroad bridges in Kansas City, Missouri are founded on drilled shafts embedded into the soil and underlying shale. The uncertainty arising from the non-homogeneous, anisotropic nature of mo
Jan 1, 2006
-
Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield TerminalBy Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, ItalyBy Roberto Folchi
This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel
Jan 1, 1994
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central FloridaBy Amr M. Sallam
In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD
Jan 1, 2006
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998