  • DFI
    Deep Excavation Retaining Systems In Unsaturated Soils

    By Tariq B. Hamid

    Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav

    Jan 1, 2006

  • DFI
    Deep Excavations And Foundations For Locks ? Synopsis

    By B. H. Moore

    Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f

    Jan 1, 2010

  • DFI
    Deep Foundation Construction Using "Top/Down" Building Techniques In The United States

    By David C. Lager

    While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d

    Jan 1, 1987

  • DFI
    Deep Foundation Design For Liquefaction Induced Lateral Spreads

    By Zia Zafir

    Design of the deep foundations for the loads imposed by lateral spread include the estimate of the pressure applied by the liquefied material as well as amount of anticipated displacement. In the abs

    Jan 1, 2006

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    Deep Foundations In Hong Kong - Synopsis

    By Martin Pratt

    This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr

    Jan 1, 2000

  • DFI
    Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, Tennessee

    By James L. Vinson

    Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to

    Jan 1, 2006

  • DFI
    Deep Foundations In The Challenging Geology Of Central Florida

    By Gary Kuhns

    Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo

    Jan 1, 2003

  • DFI
    Deep Foundations In Washington, DC

    By Douglas W. Christie

    Deep foundations in Washington, DC have played a role in the city?s development since the 19th century. Designers of government and commercial buildings sought deep foundations initially to minimize

    Jan 1, 2006

  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
  • DFI
    Deep Foundations on Buildings using Driven Ductile Iron Micropiles.

    By Antonio A. Cristóvão, Alexandre Pinto

    "Abstract Deep foundations of buildings using driven ductile iron micropiles TRIM solutions, leads to recognized advantages, from technical, schedule and economic points of view. High production rate

    Jan 1, 2014

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic Design

    By Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook

    500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created

    Jan 1, 2018

  • AUSIMM
    Deep Leaching and Accelerated Post-Mine Oxidation in the 500 Orebody at Mount Isa

    Structurally- controlled deep leaching processes have removed vast quantities of carbonate from a substantial portion of the "silica-dolomite" enclosing the 500 copper orebody. Mine drainage

    Jan 1, 1968