Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Desenvolvimento De Tubos Erw/hfiw Casing Api5ct Grau N80 Com Alta Resistência A ColapsoBy Marcus Wolter Ferreira
O objetivo deste trabalho é desenvolver uma metodologia para aprovação de tubos com alta resistência a colapso de acordo com os requisitos da norma internacional API5CT grau N80, produzidos por tratam
Oct 30, 2017
-
Desenvolvimento De Um Sensor Virtual Para Estimar A Taxa De Recuperação De Minério Usando Rede Neuro-fuzzyBy Jedson Alessandro Damasceno
Atualmente, a maioria dos pátios utilizam recuperadoras com roda de caçambas para remover o minério das pilhas de estocagem. Tipicamente, estas máquinas são operadas manualmente, com todos os moviment
Aug 17, 2017
-
DESENVOLVIMENTO DE UMA BASE DE CARACTERÍSTICAS DE BIOMATERIAIS PARA AUXILIAR O CONHECIMENTO DA OSSEOINTEGRAÇÃO EM TiO2By Mateus Luiz Gamba
O titânio e suas ligas são aplicados em grande escala em implantes ósseos por apresentarem excelentes resultados de biocompatibilidade. No entanto, ainda não existe um consenso na literatura com relaç
Aug 8, 2018
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Design & Development of the Barmac RotopactorBy Bryan A. Bartley
"Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla
Jan 1, 1985
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic ShakingBy Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008
-
Design Analysis Of Underground Mine Ore Passes: Current Research ApproachesBy Stephen R. Iverson, Bill M. Stewart, Michael J. Beus
The U.S. Mine Safety and Health Administration (MSHA) has identified ore pass hazards as a significant safety problem in underground metal mines in the United States injury and fatality data show that
-
Design And Application Of Vertical Micropiles To Resist Large Lateral LoadsBy Helen D. Robinson
Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,
Jan 1, 2010
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
Design and Commissioning of the Ridgeway ConcentratorBy B Clemen, D Gordon, F Cesnik, P Griffin
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm
Jan 1, 2003
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Design And Construction Challenges At The Gualcamayo Mine ? IntroductionBy N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re
Jan 1, 2011
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Design and Construction Evolution of the Kemess Mine Tailings DamBy Georgia J. Lysay
The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat
May 1, 2007
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft GroundBy Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001