Search Documents

Sort by

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • DFI
    Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? Synopsis

    By A. F. Deng

    A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock

    Jan 1, 2010

  • SME
    Design of the High Capacity, Horizontally Curved Overland Conveyor at Batu Hijau

    By Philip K. Chan

    Batu Hijau is a new copper and gold mine located on the island of Sumbawa in the Republic of Indonesia. This paper details the design and construction of the Batu Hijau overland conveyor, one of the m

    Jan 1, 2000

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • NIOSH
    Design Of Underground Openings In Competent Rock - Summary

    By Leonard Obert

    THIS REPORT presents methods and principles useful in designing underground mine openings and pillars in competent rock formations. Two types of formations are considered: (1) Massive formations, in w

    Jan 1, 1960

  • AUSIMM
    Design of Yield Pillars for Improved Stability of Colliery Roadways

    By Bhattacharyya A. K

    A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction

    Jan 1, 1995

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • NIOSH
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e

  • SME
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en

    Jan 1, 2004

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • SME
    Design Principles for Soft Ground Cutterheads

    By Werner Burger

    The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below

    Jan 1, 2007