    Design Procedure For Hydraulic Backfill Distribution Systems

    A wide range of materials are used in hydraulic backfilling operations and the pipeline flow behaviour of these mixtures varies considerably. It is shown that despite the large differences in constitu

    Jan 1, 2001

  • SME
    Design Review Of A Rectangular Shaft In Alluvium

    By P. D. Pack, E. H. Skinner

    During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio

    Jan 1, 1977

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SAIMM
    Design Rules For Avoiding Draw Horizon Damage In Deep Level Block Caves

    Deep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful

    Jan 1, 1999

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)

    By G. Miller

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant

    Jan 1, 2001

  • SAIMM
    Design tools to minimize the occurrence of ore pass interlocking hang-ups in metal mines

    A comprehensive review of ore pass records, from ten Quebec underground mines, indicated some of the limitations of available design tools to predict the occurrence of ore pass interlocking hang-ups i

    Jan 1, 2003

  • SME-ICGCM
    Design Trade-Off For Angle Roof Drilling

    By James H. Fletcher

    Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support

    Jan 1, 1982

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • AUSIMM
    Design, Construction, Commissioning And Operating Of the Elura Concentrator

    By Morrison R. D

    This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co

    Jan 1, 1983