Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Considerations For The Damang Open Pit ExpansionBy A. Haines, O. Varaud, I. Baidoo
Abosso Goldfields Limited (AGL) is in the process of developing an expansion of their Damang Open Pit gold mine in Ghana. AGL acquired the Damang mine in January 2002, with SRK participating in the ge
Jan 1, 2006
-
Journal: Safety Talk / Determining The REAL Cost of An AccidentBy Mark Abernathy
When most people think of a motor vehicle accident, the direct costs resulting from that accident, such as vehicle repair or towing charges, are generally easy to quantify. However, the indirect costs
Jan 1, 2006
-
Loy Yang Power, GHD ù A Case Study in AlliancingBy P Wood
Loy Yang Power (LYP) owns and operates a 2160 MW brown coal fired, base load power station in the Latrobe Valley, Victoria, Australia (Loy Yang A). It also owns and operates a brown coal mine that sup
Jan 1, 2006
-
Optimization Of An Autonomous Vehicle Dispatch System In An Underground MineBy P. Saayman
The mining industry has much potential for automation. A great deal of work has been done on this subject and is still ongoing. With automation comes the possibility for optimization, because more inf
Jan 1, 2006
-
Secant CFA- Pile Walls - A Risk Management ViewBy Mandy Korff
Walls consisting of CFA-piles are often used for vertical cut offs for building pits. Several methods of installation and geometry may be used and sizes, depths and strengths of walls necessary vary w
Jan 1, 2006
-
The Strategic And Tactical Value Of A 3D Geotechnical Model For Mining Optimization, Anglo Platinum, Sandsloot Open PitSandsloot open pit is situated on the northern limb of the Bushveld Complex, 250 km north east of Johannesburg, South Africa. Sandsloot is currently the largest open pit platinum mine in the world and
Jan 1, 2006
-
Applied Geomechanics for Support Design in German Deep Coal MinesBy Holger Witthaus
Beside the traditional geomechanical evaluation methods the geotechnical parameters are recognized as important facts of the planning work for multiple seam mining. Standards for applied monitoring an
Jan 1, 2006
-
Journal: Make a Good Impression / Pre-blast SurveysBy Sandra Penttinen
There are several ways to get a positive reaction from neighbors to blasting projects. When you need to enter structures to conduct a pre-blast inspection, the impression you make on the structure own
Jan 1, 2006
-
Capacity Of Driven Piles In SandBy Mohab Sabry
Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th
Jan 1, 2006
-
Coal Ash Disposal at Rotowaro Minesite: 1 Mt Non-Notified ConsentBy R J. Mills, B S. Sinclair, D A. Fergusson, A G. Goldstone
In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat
Jan 1, 2006
-
Journal: A Case Study of Full-Face Blasting in a Highway Tunnel in KoreaBy Hae-Moon Choi, Sang-Don Lee, Chang-Ha Ryu
The purpose of the study presented in this article is to establish a standard blast pattern to yield optimum blasting performance along with an attempt to reduce a difference between design and constr
Jan 1, 2006
-
Comparative Study Of The Effects Of Solidification Rate On The Cast Microstructures Of Aluminum Alloys 6016 And 6009By P. N. Anyalebechi
The effects of solidification rate on the cast microstructures of aluminum alloys 6009 and 6016 have been investigated with directionally cooled laboratory-size ingots, at 0.2-10.1 K/s and 0.4- 23.1 K
Jan 1, 2006
-
Prevention Of Frictional IgnitionsBy P. C. Thakur
Frictional ignitions (also called face ignitions) is defined as the rapid oxidation of a mixture of methane and air with a visible flame that could last from a few seconds to several minutes. These i
Jan 1, 2006
-
Continuous Grouting In Embedding Of Sheet PilesBy Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Mining Engineering Education Initiatives in AustraliaBy Bruce Hebblewhite
Australia’s Minerals Tertiary Education Council (MTEC) has achieved several successes during its first three years of operation. This initiative was developed through the Minerals Council of Australi
Jan 1, 2006
-
Composite Failure Mechanisms In Coal Measures Rock Masses - Myths And Reality - 1. IntroductionBy John V. Simmons, Peter J. Simpson
Excavated slopes in open pit coal mines are designed to be as steep as possible consistent with stability and safety requirements. Slope failures occur for many reasons, including oversteepening. Th
Jan 1, 2006
-
Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal MiningBy Rudy J. Matetic
Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment
Jan 1, 2006
-
A New Advanced CFD Model For Flash Smelting And Converting ProcessesBy Tapio Ahokainen
Commercial modeling software and increasingly efficient computers enable today computational fluid dynamics (CFD) to be used as a tool for a more comprehensive understanding of the flash smelting and
Jan 1, 2006
-
Rehabilitating a Historical Coal Mine in Wangaloa, New ZealandBy C M. Evans, D Thomas
Solid EnergyÆs Wangaloa open cast coal mine was operated between 1945 - 1989, and remained closed and disused until 2001 when SENZ initiated a mine rehabilitation programme. It is nearing the final st
Jan 1, 2006
-
A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.By Simon St J Tose
The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t
Jan 1, 2006