    Recent Developments in Stress Analysis and Live Reclaim Prediction within Iron Ore Stockpiles

    By K C. Williams, A W. Roberts, J D. Prigge

    For stockpile design, the flowability and structural interfaces are critically dependant on the stress conditions throughout the pile. Historically, the predictive methodologies for stress determinati

    Aug 12, 2013

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    The Mount Victor Gold Mine, Eastern Highlands Province, Papua New Guinea

    By Sie A

    After completing a feasibility study in 1987, Niugini Mining Limited (NML) obtained five Gold Mining Leases within PA 632, covering the Mount Victor and Clarkes Ridge gold deposits. Reserves prior

    Jan 1, 1991

  • AUSIMM
    Determination of Low Concentrations of Tin in Ores

    By Alvin J. F

    Tin in ores containing 0·025 to 1·5 per cent tin can be determined polarographically by the reduction of the chlorostannite ion at the dropping mercury electrode in 2M hydrochloric acid solu

    Jan 1, 1962

  • AUSIMM
    Project Management in China - Sino GoldÆs Story

    By C Johnstone

    Project management is not a task to be undertaken lightly. Mining projects generally present even more challenges due to ChinaÆs remoteness and complexity. Having experiences in project management in

    Jan 1, 2009

  • AUSIMM
    Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, Indonesia

    By D J. Corp

    The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre

    Jan 1, 1999

  • AUSIMM
    A Brief History of Filtering Practive at Risdon

    Filtration of pulps of varying densities is an essential operation in the hydro-metallurgical production of zinc. The use of filters naturally applies only to the "wet" plants, and in these

    Jan 1, 1949

  • AUSIMM
    The Flotation of Water-Soluble Minerals ù Peculiarities and New Technologies

    By V Novoselov, R Sabirov

    Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli

    Jan 1, 2005

  • AUSIMM
    Mining Operational Effectiveness ù An Argyle Diamond Mine Case Study 2002

    Operational effectiveness is fundamental to any operation, becoming highly topical in those experiencing less than optimal output from their fleets. It is all encompassing aiming to identify those fac

    Jan 1, 2003

  • AUSIMM
    Gippsland Basin Resources for Long Term Economic Prosperity

    It has long been recognised that Australia can benefit substantially in an economic sense from its rich resource base. The significant resources of the Gippsland Basin are a good example of the weal

    Jan 1, 1992

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • AUSIMM
    The Relation of Ore-Occurrence to General Geology, Brocks Creek District Northern Territory, Australia

    The area (330 sq. miles) shown on the map of the Brocks Creek District (Fig. 1), was mapped by the Northern Territory geological party of the Aerial, Geological and Geophysical Survey of Northern Aust

    Jan 1, 1950

  • AUSIMM
    A Study on Main and Interaction Effects of Operating Variables of Column Flotation

    A Study on Main and Interaction Effects of Operating Variables of Column Flotation

    Sep 13, 2010

  • AUSIMM
    Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces Mine

    By R M. Arellano, D M. W Harney, M Makhuvha

    Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous

    Aug 18, 2014

  • AUSIMM
    Loy Yang Power, GHD ù A Case Study in Alliancing

    By P Wood

    Loy Yang Power (LYP) owns and operates a 2160 MW brown coal fired, base load power station in the Latrobe Valley, Victoria, Australia (Loy Yang A). It also owns and operates a brown coal mine that sup

    Jan 1, 2006

  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • AUSIMM
    A Few Observations on Mine Surveying and Surveying Instruments

    The principles of geometry and trigonometry are so continuously used by mining engineers for the purpose of accurately and intelligibly recording their measurements, that the writer is prompted to lay

  • AUSIMM
    The Mining Industry and The National Economy of Australia

    Your Excellency, on behalf of the Council of the Australasian Institute of Mining and Metallurgy, and, indeed, on behalf of everyone present, I extend to you a welcome, and our thanks for your graciou

    Jan 1, 1944

  • AUSIMM
    Production of Cobalt Oxide, Cobalt Sulphate and Electrolytic Cobalt

    In, one stage of the purification sequence of the zinc sulphate electrolyte used at Risdon, cobalt is, precipitated as cobalt nitroso-,B-naphtholate, which is separated from the solution by filtration

    Jan 1, 1949