    Isometric Mines Plans: Their Applications, Limitations, and Method of Construction

    IN the construction of a set of ordinary mine plans, two axes or coordinates are used; also, two different projections are essential viz., a plan (horizontal projection) and longitudinal section (vert

    Jan 1, 1919

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • AUSIMM
    An Occupational Health and Safety Perspective on the Water Systems in Mining

    By J Field

    Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining

    Jan 1, 2006

  • AUSIMM
    Classification and Nomenclature of Ore Reserves

    In 1953, Dr. N. H. Fisher of the Bureau of Mineral Resources, acting on behalf of the Society of Economic Geologists, which is considering the sponsoring of a uniform system of nomenclature for ore re

    Jan 1, 1955

  • AUSIMM
    Validation and Simulation of Optimised Compressive Crushing

    Validation and Simulation of Optimised Compressive Crushing Ores and aggregates are used in countless applications all around in the society. The frequent and escalating usage of these natural resour

    Sep 13, 2010

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011

  • AUSIMM
    Application of Discrete Element Method for Simulating Feeding Conditions and Size Reduction in Cone Crushers

    Application of Discrete Element Method for Simulating Feeding Conditions and Size Reduction in Cone Crushers

    Sep 13, 2010

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Permitting the Grey River Dredge

    By E Breese

    The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite

    Jan 1, 1989

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Tracer-Based Mine-Mill Ore Tracking Via Process Hold-ups at Northparkes Mine

    By M Wortley, R Morrison, T Rivett

    The tracking of ore through process hold-ups such as stockpiles has been traditionally been difficult to achieve. The inability to pinpoint the exact source in the mine of material that is feeding a p

    Jan 1, 2009

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    The Modernisation and Upgradeáof Concentrator Operations at the Chelopech Mine, Bulgaria - Design, Installation and Operation of the 250 tonnes per hour Comminution Circuit

    By K Evtiminova, G Jobson, M Nolte, S Meik

    Chelopech Mining EAD (CMEAD) is a wholly owned subsidiary of Dundee Precious Metals Inc (DPM) and operates the Chelopech underground mine and processing facility located in Bulgaria. The final product

    Oct 29, 2012

  • AUSIMM
    Development of Underground Gold Processing Plants

    Development of Underground Gold Processing Plants Underground gold processing plants have potential advantages over traditional surface installations related to a smaller environmental footprint, red

    Sep 13, 2010

  • AUSIMM
    Some Aspects of Tailings Disposal

    By C J. Hogan

    Increasing demand for fine grinding to improve mineral liberation and metal recovery and the need for stricter control of the environmental impact of tailings deposition poses problems for tailings di

    Jan 1, 1993

  • AUSIMM
    Managing Challenges Faced in the Brownfield Commissioning of an Ultra-Fine Hematite Processing Circuit at ArriumÆs Iron Duke Ore Beneficiation Plant

    By E Selvapandian, R Barr

    Arrium (previously OneSteel) initiated a desktop study into the performance of its hematite ore beneficiation plant in early 2010. The beneficiation plant utilises jig concentrators and spirals to upg

    Aug 12, 2013

  • AUSIMM
    Storage and Time - A Paradigm for Aquifer Pressure Management Beneath Open Cut Mines

    By S Yuen, T Rana, S Khan

    Many open pit mines require dewatering or need aquifer depressurisation systems to manage mine water inflow and/or mine floor stability. In many instances these mining operations impact on regional gr

    Jan 1, 2009

  • AUSIMM
    Planning Disposal of Mine Wastes in New Zealand

    The main factors which influence disposal of mine waste under New Zealand conditions are identified and discussed: namely, geological conditions which produce soft weather-sensitive waste, wet and col

    Jan 1, 1986

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013