Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geothermal Resources and Developments in New Zealand and the South West Pacific

    The Southwest Pacific is a region of active volcanism and geothermal systems. Only in New Zealand have the geothermal systems been exploited for electricity generation and industrial processing. At pr

    Jan 1, 1990

  • AUSIMM
    Velvet underground exhumed – discovery and development of a new mining front at the Kanowna Belle gold mine

    By G Tripp, G Lorusso

    The Velvet gold orebody (153 Koz Au) is located near the Kanowna Belle gold deposit in the Boorara Domain of the Kalgoorlie Terrane, a subdivision of the Archaean Eastern Goldfields Superterrane (Swag

    Sep 20, 2017

  • AUSIMM
    The Inter-dependence of Mining and Mineral Beneficiation Processes on the Performance of Mining Projects

    By McKee D. J

    Much research is aimed at providing a revolutionary advance in technology that has the potential to render current mining and beneficiation problems obsolete. Such revolutionary advancements have b

    Jan 1, 1994

  • AUSIMM
    Near real-time assay with downhole assay tool (FastGrade™ 100)

    By B Chi, A Mahanta, R A. M Maddever, O Dominguez

    BHP Billiton, in collaboration with Sodern and CSIRO, has developed a downhole logging tool for measuring geochemistry in situ. The FastGradeTM 100 (alternatively, FG100), exploits pulsed fast and the

    May 9, 2017

  • AUSIMM
    Laser Scanning of Conveyor Ore Profiles

    By S Grobler, T Fares

    Understanding the real utilisation of the available volumetric capacity of a conveyor is key to unlocking latent capacity or ‘debottlenecking’ existing plant. Conveyors are typically designed on the b

    Jul 13, 2015

  • AUSIMM
    Coal Pillar Design Criteria for Surface Protection

    Large areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting

    Jan 1, 2005

  • AUSIMM
    Controlled Recirculation: Longwall Coalface Working District Climatic Prediction

    By Tuck M. A

    The increasing depth, mechanisation and distance of working areas from surface connections places an ever greater contaminant burden on ventilation airflows. Some British Coal mines are already exp

    Jan 1, 1988

  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Geological Exploration at North Broken Hill Limited

    This paper summarizes the progress of geological exploration at North Broken Hill Ltd.The North Mine orebodies occur in knots of minor folds on a simple limb structure which is itself highly folded, g

    Jan 1, 1956

  • AUSIMM
    Photostructural Detection of Concealed Cleat and Faults Influencing Coal Mine Planning

    Coal cleat and faulting influence failure, gas release, and choice of preferred mining directions, locations, and sequences. Unfortunately soil and younger rock cover restrict direct mapping of these

    Jan 1, 1979

  • AUSIMM
    The Improvements in Control of the Mill 3 Circuit at AlcoaÆs Wagerup Refinery

    By D Nicoli, P Feltoe

    The operation of grinding circuits are vital to the success of most mineral processing operations in the provision of effective size reduction whilst maximising throughput. However these same circuits

    Jan 1, 2000

  • AUSIMM
    The Port Hedland FINMET« Project - Fluid Bed Production of High Quality Virgin Iron for the 21st Century

    By Mayfield P. L J, Honeyands T. A

    BHP's two million tonne per annum nominal capacity Hot Briquetted Iron (HBI) plant at Port Hedland in the Pilbara region of Western Australia is based on FINMET¦¦ direct reduction technology. T

    Jan 1, 1999

  • AUSIMM
    Cenosphere Formation during the Combustion of Pyrite

    Magnetite cenospheres 40-270 I/m in diameter have been found during the combustion of pyrite concentrate.Micrographs of the surface and internal structures are presented together with comment on the m

    Jan 1, 1980

  • AUSIMM
    The Use of 3-D Computer Techniques for Optimal Resource Assessment and Mining - Greymouth Coal Limited

    A 3-D computerised model of the southern part of Greymouth Coal Limited's Coal Mining Licence area has recently been completed. This model, and associated 3-D CAD tools, has/is being used to opti

    Jan 1, 1996

  • AUSIMM
    Mining Education in Australasia

    THE Australian States and New Zealand have for many years provided instruction in mining, metallurgy, geology, and their allied subjects through their Universities and Schools of Mines. Though such ed

    Jan 1, 1915

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    A Carboniferous Bentonite Province in New South Wales

    Recently discovered Carboniferous bentonites are variable in charadeI and thickness, but being altered aeolian, ash-fall tuffs, they are probably extensive. Most are the Ca-montmorillonite type withou

    Jan 1, 1965

  • AUSIMM
    Presentation of the Institute Medal, 1977 to Howard Knox Worner, C.B.E.

    By J. K. A. McLEOD

    Address by the President of the Institute (Mr J K A McLeod) in presenting the Institute Medal to Howard Knox Warner, C.B.E. Address by Howard Knox Warner after accepting the award.

    Jan 1, 1978

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014