Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Lead Isotope Classification of the A.B.H. Consols and Brownes Shaft Veins at Broken Hill, N.S.W.

    Lead isotope measurements indicate that lead from the A.B.H. Consols mine and two transgressive veins in Browne's shaft is "Thackaringa" type and not "Broken Hill" type.

    Jan 1, 1970

  • AUSIMM
    Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)

    By K Gardner, R Fraval, V Singh

    Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise

    Mar 22, 2022

  • AUSIMM
    Distributed Collaborative Immersive Virtual Reality Framework for Future Mine Scenarios

    By T Bednarz

    The present work proposes a distributed collaborative immersive virtual reality framework for prospective applications in the mining industry. A human-centered approach is described, with people being

    Nov 22, 2011

  • AUSIMM
    Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation

    By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn

    A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan

    Jul 25, 2018

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    Reply to Contributed Discussion (This Issue) by Gavin W. Clarke and Roger G. Taylor

    The additional information that Clarke and Taylor (1982) provide about the important but poorly documented Ardlethan deposit is, of course, very welcome. However their contention that structural consi

    Jan 1, 1982

  • AUSIMM
    A waste fines cell with a multitude of concurrent activities

    By J J. Boshoff

    This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the

    Jul 23, 2018

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery

    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery The metallurgical process designed to treat the El Boleo Cu-Co-Zn-Mn ore invol

    Sep 13, 2010

  • AUSIMM
    Some Analyses of Mount Lyell Ores, Rocks. ETC

    These may be of interest to members examining the collection of ores, etc., from Mount Lyell, which is a feature of the Victorian Gold Jubilee Exhibition, and may have some value as geological records

    Jan 1, 1902

  • AUSIMM
    The Application of Roasting Pretreatment for Antimonial Refractory Gold and Silver Ores

    The Application of Roasting Pretreatment for Antimonial Refractory Gold and Silver Ores

    Sep 13, 2010

  • AUSIMM
    Iron Ore Tailings Reprocessing to Maximise Ore Production

    By I Sherrell, R Jain

    Worldwide iron ore feed grades are trending downwards and will continue to do so with the increasing difficulties of upgrading ores. This has led to operations looking for ways to capture current tail

    Jul 13, 2015

  • AUSIMM
    Characterisation of Manganese Ores

    Characterisation of Manganese Ores

    Sep 13, 2010

  • AUSIMM
    Exploration Success at the Martabe Gold Mine, Indonesia

    By P Albert, S Crispin, J Hertrijana

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Martabe gold mine is Indonesia’s largest precious metals-only producer and is also one

    Mar 18, 2015

  • AUSIMM
    An Investigation of Expanding Split Sets in Weak Ground

    By G Davison, C Rossimel, M Bouazza

    Expanding rock bolts anchor within a rock mass more efficiently than non-expanding varieties. This is of great importance in weak ground conditions, where grouted friction bolts perform less efficient

    Mar 24, 2014

  • AUSIMM
    Base Metal Mineralisation on Northern Great Barrier Island

    Base metal sulphide mineralisation on the northern end of Great Barrier Island is spatially associated with hypabyssal intermediate to acidic intrusives, in transgressive structures in indurated, comp

    Jan 1, 1984

  • AUSIMM
    Oxygen in Matte and Oxidic Nickel in Slag (761da7cb-f038-4aa0-94ae-a2b08821817f)

    Based on the examination of thirty sets of contiguous matte and slag samples taken from industrial nickel smelters a relationship is predicted between oxidic nickel in slag, oxygen in matte and the Ni

    Jan 1, 1980

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • AUSIMM
    The Testing and Evaluation of Australian Placer Deposits (a49af85e-318b-4a04-a0c2-bde102a5b398)

    Some important mineral fields are referred to in discussing the formation of placer deposits in Australia.Testing methods include boring by hand, with percussion rigs, with auger and pit digging drill

    Jan 1, 1966

  • AUSIMM
    Mining Equipment Maintenance Management

    By M Kuruppu

    Large mining operations require a high percentage of the capital invested in mobile and fixed mining machinery. From an investment point of view this expenditure must be met by an equally high rate of

    Jan 1, 2006