Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel DesignBy A Smith
Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro
Mar 8, 2011
-
Measurement of Blast Vibrations: Compliance under the RMAWith the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
The Value of Consulting with the CommunityBy M L. van Kampen
The recent (2005) amendments to the Resource Management Act 1991 have made it clear that there is no obligation on an applicant to consult. However the importance and value in consulting with the comm
Jan 1, 2006
-
Belt Road Segregation and Escapeways - Compliance or Risk Management?By M Olsen
"Segregation of conveyor roadways is a ventilation practice that is being increasingly applied in Australia. It is largely driven by the legislated requirements in Queensland pertaining to separation
Jul 1, 2013
-
Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect EnvironmentRecycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment
Sep 13, 2010
-
Numerical Modelling of Monorail Support Requirements in Decline DevelopmentThis paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins
Dec 6, 2010
-
The Influence of Molecular Structure of Ampholytic Polymers on their Behaviour and Flocculation Activity in Sedimentation ProcessesBy Hoberg H, Schneider FU
The stability of suspensions can frequently be controlled only by the use of supplementary polymeric agents. Such methods date back to the time of the ancient Egyptians, who used natural rubber as
Jan 1, 1993
-
Developing dephosphorisation technique for iron ore with reductionprocessBy K Higuchi, K Saito, O Ishiyama
Iron ore in Australia is predicted to increase in its phosphorus content in the near future, which is detrimental to properties of steel product. Steelmakers are concerned by the content of phosphorus
Sep 18, 2023
-
Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored ShaftsBy R M. Stephenson
Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi
Mar 24, 2014
-
Decrepitation of lump iron oresBy S Hapugoda, M Kilburn, M Adam, L Lu
Lump ore is one of the key ferrous materials used in the blast furnace ironmaking process, typically accounting for 5–25 per cent of the blast furnace ferrous burden. Like other ferrous materials, the
Jul 24, 2017
-
Comparison of Glass-fibre Reinforced Polymer Rock Bolts with Double Corrosion Protection Steel Rock Bolts for Use in Tunnel ApplicationsBy S J. Clarke, G Sieders
Double corrosion protection (DCP) rock bolts have evolved to become complicated assemblies comprising numerous components. This complexity is mainly associated with durability considerations including
Sep 17, 2014
-
Production of Aggregates in New Zealand û The TrendsBy J P. Ashby
Compared with elsewhere in the world, New Zealand quarries have tended to be mostly small. The reasons for this are a combination of the relatively high transport costs, low population density and a p
Jan 1, 1993
-
Real-Time Image Analysis of Size and Shape Distributions of Rock FragmentsAn image analysis system has been built which automatically digitizes camera input of rock fragments, analyses the digitised data to determine the sizes and shapes of the rock fragments, and outputs
Jan 1, 1988
-
Pike River Coal - Modern Mine DesignThe Pike River Coal Company is set to develop the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the Brunner S
Jan 1, 2005
-
Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site ConditionsBy S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss
Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae
Nov 4, 2015
-
Use of Large Twin-Power Scrapers in Prestrip OperationsThe use of scrapers in mining and earthmoving operations is not new, in fact they are one of the earliest methods of bulk earthmoving. A single machine which can load, haul, and dump material with a m
Jan 1, 2003
-
Optimisation of Rock Disintegration Based on Acoustic Background of Drilling MachineBy J Fut=
The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of
Jan 1, 2003
-
Interacting with the Daily Operations and the Need to Plan for Future RehabilitationMine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
Development of a Corrosivity Classification for Weld Mesh Support at Cannington MineCannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo
Nov 25, 2010
-
Stabilisation of Pit Slopes, Waikaka Alluvial Gold MineWet mining of auriferous gravels at L & MÆs Waikaka operation in Southland creates spoil dumps derived from stripping of a clay rich overburden, tailings from past dredging and the processing of aurif
Jan 1, 2002