Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Features of an Intact Fossil Hydrothermal System and Implications for Gold Mineralisation: Onemana, Coromandel Peninsula, New Zealand

    By M R. Stevens, W Mori, G B. Boswell

    The Onemana prospect is located on the eastern Coromandel Peninsula, North Island, New Zealand. Systematic exploration involving surface geological mapping, geophysics, rock and soil geochemistry, rev

    Jan 1, 1995

  • AUSIMM
    An Evaluation of Froth Recovery Measurement Techniques

    An Evaluation of Froth Recovery Measurement Techniques

    Sep 13, 2010

  • AUSIMM
    Description of Lead Refinery

    The building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is

    Jan 1, 1918

  • AUSIMM
    A Sustainable Minerals Sector in Australia? Thoughts from a Science and Technology Perspective

    In the context of sustainable development, the Minerals Council of Australia (2010) states that 'investments in minerals projects should be financially profitable, technically appropriate, enviro

    Jun 1, 2010

  • AUSIMM
    Review on Some Research Methods of Mineral Crystal Chemistry and Computer Simulation on Flotation

    Review on Some Research Methods of Mineral Crystal Chemistry and Computer Simulation on Flotation

    Sep 13, 2010

  • AUSIMM
    Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, Australia

    Quantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr

    Jan 1, 2003

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor - Further Improvement

    By R Symes

    The Fosterville Goldmine in Victoria Australia employs the BIOX« Process to liberate gold from its sulfidic flotation concentrate through bacterial oxidation. Gold occurrence is primarily as submicron

    Oct 29, 2012

  • AUSIMM
    Underground Mines of Tomorrow

    By P Hatherly, H Gurgenci

    With the depletion of the mineral reserves that can be mined by surface mining, demand for highly productive and safe underground mines will increase. Underground drill and blast techniques continue t

    Jan 1, 1998

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Research Into the Revegetation of Concentrator Tailings Dams at Mount ISA

    By Whiteman P. C, Stacey G. S, Hunter G. D

    Processing of lead-zinc and copper ores by Mount Isa Mines Limited produces large quantit- ies of concentrator tailings waste which is pumped as a slurry to special dams where the solids are allowed

    Jan 1, 1974

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut Algorithm

    By S Chatterjee

    The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul

    Nov 24, 2014

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    The Effect of Particle Size Distribution in Electrostatic and Magnetic Separation on Mineral Recovery and Yields

    By J Ledgerwood

    Namakwa Sands is a mineral processing company based on the West Coast of South Africa and is solely owned by Exxaro Resources Limited. Mineral ore is mined and processed, concentrated and both chemica

    Oct 5, 2011

  • AUSIMM
    The Tajo Largo Gold Deposit, Argentina - Mineralogy and Fluid Inclusions Study

    By A S. Fogliata, L Bengochea, G Mas, J E. Lazarte

    The Culampajß auriferous district is located in the northern sector of the eastern edge of the homonymous hill, Catamarca Province, Argentina. Tajo Largo mine is situated in the southern flank of Las

    Jan 1, 2008

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Underground Extension of the FGC Line in Sabadell through Cemented Soils

    By R Justa Cámara, J María Bertrán Llop

    "The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is

    Sep 17, 2014

  • AUSIMM
    Interactions between Flash Flotation and Gravity Concentration – An Industrial Case Study of a Refractory Gold Concentrator

    By D Semini, B Newcombe

    Base-metal sulfide refractory gold ores often contain a portion of ‘free’ gold that is amenable to recovery using gravity concentration methods, whilst the refractory portion of the gold is better rec

    Sep 1, 2014