Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Study of Anomalous Copper-Lead-Zinc Values in Relation to Rock Types and Weathering Profiles in an Area North of Mount ISA

    In an area north of Mowit Ica chip sampling of limonitic outcrops on a regional scale led to the investigation of a number of areas considered to be geochemically anomalous for copper and zinc. Th

    Jan 1, 1973

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    An Analysis of Blasting Profitability and Productivity

    The mining industry is quite often faced with declining selling prices for its products in the face of rising prices for the input cost resources that it uses. Blasting is a key activity within the mi

    Jan 1, 2001

  • AUSIMM
    Planning the Extraction of the Lead Orebodies Below 15 Level at Mount Isa

    By Clifford C. E

    The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr

    Jan 1, 1979

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Long Shaft ù A Deep Level Mining Success Story

    By G McLeay, T Moran

    Long Shaft has traditionally been seen as one of the most challenging mines in the Kambalda area with operations having been suspended by the previous owners in 1999. When mining recommenced in Octobe

    Jan 1, 2005

  • AUSIMM
    Gas Power Generation at the Sons of Gwalia Mine, W.A.

    By Dunstan N, Valentine C

    Gas power was first used on the Sons of Gwalia mine in January 1911, when a twin-cylinder Crossley engine of 167 hp was installed to belt-drive a 112 kw 550-volt ac generator. This engine was connecte

    Jan 1, 1932

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    The Role of Contractors in Open Pit Mining

    By Turner W. G, Trundle R. S, Medland D. G

    Contracting has evolved from basically a tradesman providing a service for an `employer' to a multi disciplined organisation providing an all compassing service for a client.Having commenced its

    Jan 1, 1992

  • AUSIMM
    Acid Mine Drainage Treatment at Herbert Stream, Stockton

    By M Watts, P Lindsay

    Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration

    Jan 1, 2007

  • AUSIMM
    Evaluation of Mineral Processing Effectiveness and Causes of Mineral Losses

    By Siwiec A

    The laboratory investigations which are necessary to evaluate the mineral processing effectiveness usually include density separation of narrow size fraction of the feed and one of the products. In

    Jan 1, 1993

  • AUSIMM
    Environmental Reclamation Practice in a Brazilian Coal Mine ù An Economical Approach

    By J F. Costa, A Grigorieff

    Coal mining reclamation is a worldwide concern. This paper presents a Brazilian example where the economic aspects of reclamation are considered. The basic goal of the study is to transform the reclam

    Jan 1, 2005

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • AUSIMM
    Characterising the In Situ Conditions Within Rehabilitated Spoils at South African Opencast Collieries

    By F D. I Hodgson

    Twenty-seven observation test pits were excavated at four different spoils dumps at three collieries in the Witbank Coalfield. The holes were dug into the upper three metres of the spoils to ascertain

    Jan 1, 2003

  • AUSIMM
    Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods Point

    By P Jackson, J Rea, M D. Goodz

    The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been devel

    Jan 1, 2008

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    The-Application of Optimal Control to Open-Pit Planning

    Preliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to

    Jan 1, 1984

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Quality Control Aspects of Shotcrete in Mining – The Round Determinate Panel Test

    By P M. Dight

    Shotcrete usage in declines and developments has become pervasive as operators strive to achieve production improvements. Issues of mix control, fibreload, thickness control, temperature and curing co

    Mar 21, 2011

  • AUSIMM
    Scale Suppression using Swirl Flow Technology

    By J Wu

    Swirl Flow Technology (SFT), a novel approach for agitation in large industrial slurry tanks, was jointly developed and patented by CSIRO and Queensland Alumina Ltd (QAL). Currently, SFT is used in 16

    Aug 8, 2011