Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of Environmental Discharges from Historic Coal and Gold Mines, Reefton, New Zealand

    By D Craw

    At Reefton, mesothermal gold deposits occur in the Ordovician Greenland Group basement and bituminous coal deposits occur in overlying Eocene Brunner Coal Measures. These different resource types occu

    Jan 1, 2003

  • AUSIMM
    Exploration for Epithermal Gold Deposits in New Zealand

    By R G. Barker, A B. Christie

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. More than 11 Moz of Au and 50 Moz of Ag have been produced from epithermal deposits in New

    Mar 18, 2015

  • AUSIMM
    North Baikal Region Ni-Cu Deposits

    By E V. Kislov

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Northern Baikal Ni-Cu province is located in Buryatia, south-east Siberia, and geologic

    Mar 18, 2015

  • AUSIMM
    The Mining of J Lens

    By Reeves I. And Farquhar J, Pearce S

    The irregular shape of the Rosebery orebody, coupled with the inconsistencies in grade over short strike lengths, has meant stoping blocks have had to be small to combat dilution and stability probl

    Jan 1, 1993

  • AUSIMM
    Assessment of Underground Production Blast Designs and Blasting Performance

    By B Mohanty, D Zwaan

    Systematic near-field vibration monitoring of stope blasts was carried out in a large, deep underground mine. A total of 31 production blasts were studied in order to investigate the effectiveness of

    Aug 24, 2015

  • AUSIMM
    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator

    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator A plate assisted electrostatic high tension roll separator has been used for

    Sep 13, 2010

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 2

    By N Clarke, J Hunt, A Barros, N Guerrero, L Keeney

    Grade Engineering® (GE) involves a range of integrated technologies and operating protocols for improving effective feed grade through early rejection of low value material prior to costly processing

    Nov 10, 2020

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • AUSIMM
    Some Aspects of Illawarra Coals for the Production of Blast Furnace Coke

    Iron from the blast furnace constitutes the starting point in steel production and any increase that can be made in iron production will bring about important repercussions in a long line of processes

    Jan 1, 1958

  • AUSIMM
    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Sep 13, 2010

  • AUSIMM
    Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage System

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) Method

    Vertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e

    Jan 1, 2005

  • AUSIMM
    Mine Water Resource Management Systems

    By Gillies A. D S, Lee A. H

    The major operational objectives of a mine water resource management system (WRMS) are to supply the water needs of the mine and mill, to minimise disturbance to mining due to rainfall flooding or see

    Jan 1, 1992

  • AUSIMM
    A Simulation Study on Two-Stage Grinding with High-Pressure Roller Mills

    A Simulation Study on Two-Stage Grinding with High-Pressure Roller Mills By the application of high-pressure roller mill (HPRM) in the field of mineral processing, computer simulation can be used to

    Sep 13, 2010

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: 1 Mt Non-Notified Consent

    By R J. Mills, B S. Sinclair, D A. Fergusson, A G. Goldstone

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • AUSIMM
    A deep learning based approach for roof bolt recognition in 3D point cloud of underground mines

    By B P. Banerjee, D Patra, S Raval

    Roof bolts are an essential component of roof support systems in underground mines. They are used to provide structural support to the roof of the mine and prevent it from collapsing. Therefore, it is

    Sep 1, 2024

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Personal Liability - Chartered Practising Status and Best Practice Defences for Pacrim Practitioners

    Whether you are an employee, contractor or consultant working in the mineral industry, there are pressures to deliver the best possible performance. Technical professionals are usually driven by an in

    Jan 1, 1995

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012