Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational FurnacesBy A Sadri, S Smith
In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using
Jan 1, 2006
-
Application of Optimisation Technology to Resource Planning Within BHP Billiton Iron OreBy D Xu
BHP Billiton Iron Ore is one of the world’s premier suppliers of iron ore. It currently has operations in Western Australia and Brazil and also has some iron ore interests in West Africa.BHP Billiton’
Jul 11, 2011
-
Field Characterisation of Two Full-Scale Waste Rock PilesBy D J. Williams, G W. Wilson, S, A B. Tran
A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min
Jan 1, 2003
-
Measurement of Froth Recovery of Attached Particles in Industrial Flotation CellsBy Johnson N. W, Manlapig E. V, Alexander D. J, Franzidis J. P
The importance of the froth region on flotation performance is often emphasised in the literature. It is well-known that decreasing froth depth or increasing air flowrate results in increasing cell
Jan 1, 1997
-
Oxygen Requirements and Monitoring for Gold Ore ProcessingBy Komosa T, Muir D. M
Adequate levels of dissolved oxygen are essential for efficient gold dissolu- tion. The actual levels in plantpuips can be seriously reduced by the presence of oxygen consuming reactive minerals, and
Jan 1, 1991
-
Minimising Arsenic and Mercury Mobility With Acid Rock Drainage, Northland, New ZealandRemnants of Plio-Pleistocene hot spring systems in Northland, New Zealand contain sulfide minerals, principally pyrite, marcasite and cinnabar. The climate is warm temperate to subtropical, with up to
Jan 1, 2003
-
The Simulation of a CIP Plant Incorporating Shifting Equilibria Dependent on Cyanide and CopperBy R C, K L. Rees, J S. J van Deventer
In contrast with previously published models for the carbon-in-pulp (CIP) process, the model proposed in this paper incorporates film transfer, intraparticle diffusion, simultaneous leaching, preg-rob
Jan 1, 1998
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
The Relevance Of Borehole And Bore Core Evaluation To The Design Of Underground Coal MinesThe relevance of borehole and bore core evaluation to the design of underground coal mines is illustrated by considering the technical parameters of colliery design and the information from which t
Jan 1, 1977
-
The Role of the Consulting Engineer in the Design and Construction of Projects for the Minerals IndustryBy Woods PW
Consulting Engineers have been used in the mining and metallurgical industries for many years. The traditional role of the consultant overseas has been one of assisting with conceptual design right
Jan 1, 1975
-
Condition Monitoring and Maintenance of Underground Load-Haul-Dump MachinesAt the LKAB, Iron Ore Mine, Kiruna, Sweden a preliminary investigation into the reliability characteristics of a fleet of load-haul-dump machines has shown that the hydraulic system is one of the most
Jan 1, 1991
-
Advancing diversity and inclusivity in the resources sector – a human centred focus on equipment designBy R Burgess-Limerick, D Lynas
A number of standards and guidance materials currently exist to assist equipment designers. The ISO process, however, is a formal process and change often lags behind technology development. In some c
Apr 16, 2024
-
Education in Mining and metallurgy-a Time of RethinkThe curbing of expansion in tertiary level education in Australia and the question- ing of its objectives which are now occurring are likely to have important effects on mining and metallurgical edu
Jan 1, 1977
-
Mineralogy and Textures of Vienna Wood Seafloor Hydrothermal Deposits in Manus Basin, Papua New GuineaBy T Mizuta, D Ishiyama
The Vienna Wood hydrothermal is hosted by mid-oceanic ridge type basalt in graben morphology and is located in the Central Manus Basin. The hydrothermal field is about 300 metres in diameter and consi
Jan 1, 2002
-
Modelling of gas-slag flow behaviour in the ironmaking blast furnace – a reviewBy B J. Monaghan, P Zulli, X F. Dong
In the lower zone of blast furnace (BF), slag trickles down through a packed bed of carbonaceous particles in the form of films, rivulets or droplets. During its downward flow, there are significant i
Jun 19, 2024
-
The Risks of Mining Seafloor Massive SulfidesBy D C. Laurence, J Holden
Seafloor massive sulfide deposits contain bonanza grades of gold, silver, copper and zinc metals. The deposits are often found at depths of one kilometre or more. They are characterised by active chim
Jan 1, 2003
-
AccreditationDavid Pollard will raise this matter in more aetail in a later paper, but mere are some obvious points that I wish to make. It is a relatively straightforward exercise to assess the competency at a l
Jan 1, 1994
-
Production of Submicron Particles by Autogenous Grinding with a Stirred MillBy Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M
The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par
Jan 1, 1993
-
Origin of Sedimentary Rock-Hosted Gold Mineralisation at Kyaukpahto, Kawlin-Wuntho District, Northern MyanmarThe Kyaukpahto gold deposit is located at latitude 23¦ 47Æ 55" N and longitude 95¦ 56Æ 35" E in the Kawlin-Wuntho district, Sagaing Division, Myanmar. Gold mineralisation is hosted in sandstone of the
Jan 1, 2008
-
Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis InstrumentationBy Lovett EP, Johnson CR, Dunlop GA
Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation
Jan 1, 1986