Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Computer Control of Flotation Circuits at Frood Stobie Mill

    By G. Styles, K. Lye, R. Tenbergen, M. Mayhew

    Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required

    Jan 1, 1985

  • CIM
    The Influence of Shales on Slope Instability

    "Shales play a major role in the stability of slopes, both natural and engineered. This paper attempts to provide a review of the state-of-the-art in shale slope stability. The complexities of shale t

    Jan 1, 2015

  • CIM
    Synergie Production ? Maintenance par le soins des équipements (SDE)

    By Yves-Laurent Turcotte

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Rock Stresses Induced by Shrinkage Stoping

    This paper generalizes open stopes into elliptical cross sections and applies the results of calculations based on the mathematical theory of elasticity to indicate stress distribution on the boundari

    Jan 1, 1964

  • CIM
    Investigation of the Increase in Resistivity in the Steel Collector Bar Used in Aluminum Electrolysis Cells

    By G. Gauvin

    Life span of aluminum smelting electrolysis cells can reach up to 3000 days. During this period, cathode blocks go under various physical and chemical changes that could result in an increase of elect

    Jan 1, 2011

  • CIM
    Replacement Hematite Deposits, Steep Rock Lake, Ontario

    By Hugh M. Roberts

    DEVELOPMENT at Steep Rock lake has given rise to renewed interest in the geology of the iron ore deposits in the Lake Superior Region and has implications of no small moment bearing upon methods of ex

    Jan 1, 1943

  • CIM
    Plant Expansions and CIL Optimization at Iamgold's Rosebel Operation in Suriname

    By J. Grignon, C. Fleming

    It is possible to reproduce the performance of an operating CIP or CIL plant in the laboratory, in small scale batch kinetic tests, coupled with mathematical models that translate kinetic data into pr

    Jan 1, 2011

  • CIM
    Mining (e7ac18b4-67b5-4874-86f7-745272387544)

    By Gillyeard J. Leathley

    The Cassiar Asbestos mine is situated on McDame Mountain in northern B.C. at a mean elevation of 6000 ft (1830 m), some 6 miles (9.6 km) from the townsite /mill complex. Asbestos ore production averag

    Jan 1, 1978

  • CIM
    The Effect of Disposal Configuration on the Environmental Behavior of Paste Tailings

    By Thomas Deschamps

    The main objective of this work was to investigate the effect of binder addition on the geochemical properties of surface paste tailings. Nine leaching columns were prepared following different dispos

    May 1, 2007

  • CIM
    An Overview of Spodumene Beneficiation

    By D. Imeson, T. Grammatikopoulos, G. Pearse, M. Aghamirian, C. Mohns

    "Spodumene mineral is a source of lithium for lithium ion batteries. Thus, the production of a spodumene concentrate with an approximate grade of 6% Li2O is targeted. Traditionally, spodumene is conce

    Jan 1, 2012

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    The Princess Colliery Man-Rake Rope

    By Gordon S. Farnham

    THIS paper summarizes the results of investigations carried out at Sydney Mines, N.S., and at Ottawa, following the disaster at Princess colliery, December 6th, 1938. The Honourable Minister of Mines

    Jan 1, 1939

  • CIM
    A Geometallurgical Approach of the Copper-Nickel-Platinum Group Elements Maturi Deposit, Minnesota, USA, Using Quantitative Mineralogy

    By Charles Knilans, Tassos Grammatikopoulos, Nicole Hoffmann

    "Twin Metals Minnesota LLC, (TMM) has recently completed a prefeasibility study evaluating the development and operation of an underground copper (Cu), nickel (Ni), platinum (Pt), palladium (Pd), and

    Jan 1, 2015

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • CIM
    Blast-Hole Diamond Drilling at the Sullivan Mine

    By C. D. M. Chisholm

    Introduction The Sullivan orebody is a sulphide replacement deposit in beds of argillaceous quartzites. The general strike of the vein is north and south, with rather an abrupt change to northwest

    Jan 1, 1946

  • CIM
    Breaking Out the Silos: Towards Sustainable Society – Art, Engineering and Decision Making Perspectives–

    By N. Pajunen, R. Mäkikoskela

    "The current state of environment has been achieved by acting linearly. At the same time, we know that transition towards circular economy cannot be made the same way that we have used to, trusting on

    Jan 1, 2016

  • CIM
    Separation and Purification of Rare-Earth Elements Based on Electrophoretic Migration

    By P. Hajiani

    "Feasible and sustainable separation of lanthanides outside of China has been a dilemma for the past few years. The present technique uses REE electrophoretic mobility (Ui) variation in an electrical

    Jan 1, 2016

  • CIM
    Explosives choice at East Kemptville Mine

    By J. M. Houston

    "In October 1982, Rio Algom Limited, purchased a tin prospect near East Kemptville, Nova Scotia, from Shell Canada Resources. This purchase led to the development of the first substantial tin mine in

    Jan 1, 1987

  • CIM
    Canadian Clean Power Coalition Project: The evaluation of options for CO2 extraction from existing and new coal-fired power plants

    By D. du Plessis, R. Stobbs

    The Canadian Clean Power Coalition (CCPC) was created in 2001 to protect and enhance Canada’s vast coal and other carbon-based resource wealth, and to ensure that environmental public policy decisions

    Jan 1, 2006

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,

    Jan 1, 1982