Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
Real-Time Information Support for Strategic Safety Inspection on Construction SitesBy Hao Zhang
Site inspection is an important component of safety management system. In current practices, the inspectors evaluate the safety condition on a construction site with the assistance of a standardised c
Aug 1, 2013
-
Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek ConcentratorBy O. Matwijenko
"The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi
Jan 1, 1980
-
High-Intensity Magnetic Separation of Industrial MineralsBy D. M. Ramsey
HIGH-INTENSITY magnetic separation as now practised in the commercial treatment of a large variety of industrial minerals is a com-paratively recent development, having had its practical beginning abo
Jan 1, 1937
-
Iron Ore Company of Canada (IOCC)'s New Silica Flotation PlantBy Mike Smith, George Chung
"A 23 million dollar Flotation Plant has been commissioned at the Iron Ore Company of Canada in 1998. Nine OK-50 cells &re used to float silica in this 1,400 tomes per hour plant. The paper details pr
Jan 1, 1999
-
Simulation of Bulk Earthwork and Quarry Material Delivery During Surface Mine TransformationBy S. Duvah Pentiah
The transformation of an open pit coal mine to a horizontal-punch underground mine is subject to a number of challenges. These include scheduling the operation of various sizes of trucks over a long p
Aug 1, 2013
-
Non-Wetting Rare-Earth Oxide Ceramics with Applications to Sustained HydrophobicityBy G. Azimi, K. K. Varanasi1, A. T. Paxson, R. Dhiman, H. -M. Kwon
Hydrophobic materials that are robust to harsh environments are needed in a broad range of applications. Although durable materials such as metals and ceramics, which are generally hydrophilic, can be
Jan 1, 2014
-
Low-Temperature Pressure Leaching Kinetics of Zinc Sulphide ConcentrateBy F. Guo
"The leaching kinetics of zinc sulphide concentrate was studied under total pressures ranging from 0.3 MPa to 0.5 MPa and leaching temperatures ranging from 358 K to 378 K. The apparent activation ene
Jan 1, 2012
-
Barrick Goldstrike Roaster - Roasting and Gas HandlingBy Andy Cole, Ken Thomas, Stephen Durn, Jacques McMullen
"The roasting and gas handling circuits of the Barrick Gold’s new Roasting Facility at the Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the desig
Jan 1, 2001
-
Escondida – Phase IV Grinding CircuitBy Walter S. Bergholz, Michael L. Schreder
"Since Escondida began operations in fiscal 1991, a series of aggressive expansion projects have enabled market share to be increased and ever larger profits to be realized. This was possible due to t
Jan 1, 2004
-
Analyse technique et économique du triage photométrique du mineraiRÉSUMÉ Cet article traite d’une analyse technique et économique du concept du triage optique en vue d’améliorer la rentabilité des opérations minières. Le principe du tri optique et les principaux sys
Jan 1, 2010
-
Explore the Future of MiningBy Joe Shoemaker
Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width
Aug 1, 2013
-
Tantalum Mining Corporation's Gravity Concentrator-Recent DevelopmentsBy R. O. Burt
The original flowsheet of the TANCO mill consisted of a simple two-stage gravity circuit for the recovery of the tantalum concentrates. With decreasing grade and grain size of the tantalum minerals, c
Jan 1, 1979
-
Automatic Mine Pumping With Off-Peak PowerIN 1932, the No. 4 shaft at Wright-Hargreaves mine was completed to a depth of 4,000 feet, and the lowest operating level at that time was at 3,900 feet. It was realized that the existing pumping syst
Jan 1, 1939
-
Process Development for Milling B-Zone Ore at Rabbit LakeBy S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Looking to the FutureBy Chris Twigge-Molecey
Demand for metals will continue to grow as global population numbers and prosperity levels steadily increase. Consequently, there will continue to be a need to design and construct new metallurgical p
Jan 1, 2015
-
Mine ventilation fan specification and evaluationBy J. S. Stachulak, K. A. Mackinnon
This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera
Jan 1, 2004
-
Canadian Standards for Valuation of Mineral PropertiesBy Deborah McCombe
"and Bill Roscoe, Consulting Geologist and Principal with Scott Wilson Roscoe Postle AssociatesMineral property valuations are carried out for a variety of reasons, such as mergers and acquisitions, n
Jan 1, 2003
-
A Mathematical Model for Direct Thermal Heat Recovery from Metallurgical SlagsBy S. Esfahani, M. Barati, Y. Kauwachi
"Heat recovery from slag has gained attention due to its high potential in lowering energy intensity of metal extraction processes. A direct method to recover the thermal energy of slag is to use coun
Jan 1, 2012
-
A Look at GrindingBy V. Dinesen
"Grinding is simply the function of reducing particles in size or creating new surface areas. This may be accomplished by many means but we will only concern ourselves with the continuous grinding pro
Jan 1, 1972