Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes
"The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat
Jan 1, 2017
-
Goldex, the GRG JewelBy G. Belzil, F. Robichaud, M. Fullam
"The Goldex mining and milling complex is operated by Agnico-Eagle Mines Ltd. and is located in the Abitibi greenstone belt of Northwest Quebec, Canada. The mill operates presently at a throughput of
Jan 1, 2012
-
X-Ray-Transmission Sorting at the Kensington Gold MineBy A. Takala, H. Cline, D. Girard
"This article describes the project development and successful implementation of a particle sorter at the Kensington mine. The Kensington underground gold mine and associated milling facilities are lo
Jan 1, 2017
-
Power from Coal at WabamunBy M. M. Williams
ALBERTA has been generously endowed with oil, natural gas, coal and water power, thus giving power producers a wide choice in the type of plant and fuel which can be used. Therefore, with such a varie
Jan 1, 1963
-
Engineering techniques to optimize an Arctic mineBy Alan E. Renshaw
"This paper is a practical overview of ways to reduce cost in the design and operation of an Arctic mine. The economically important issues of the Arctic mine that will be addressed include: permafros
Jan 1, 1996
-
Kitsault (Lime Creek) molybdenum mine, northwestern British ColumbiaBy C. J. Hodgson
"IntroductionThe Kitsault molybdenum mine is located 600 m above sea level on Lime Creek at the head of the inlet of Alice Arm, 140 km northeast of Prince Rupert, British Columbia (Fig. 1). The area o
Jan 1, 1995
-
Development of Mobile Inspection and Diagnostic System for Electric Power ConduitBy Sang-Kyun Woo
The electric power conduit (EPC) in Korea has been constructed since 1978. Facing the challenge of safety and sustainability of the EPC, it is urgent to develop an inspection strategy and maintenance
Aug 1, 2013
-
Western Mines- Myra, Lynx and Price depositsBy R. H. Seraphim
"Western Mines Limited produces gold, silver, copper, lead and zinc from a number of Paleozoic volcanogenic deposits near Buttle Lake on Vancouver Island. The deposits were emplaced along a series of
Jan 1, 1980
-
Recent Advances in the Design and Operation of Continuous Ion Exchange Equipment in the Mining IndustryBy R. U. Seneviratne, B. K. Ahlgren
In this paper we follow various technological discoveries and developments in the purification of minerals and metals in the mining industry by ion exchange. For approximately 100 years, ion exchange
Jan 1, 2014
-
Design of Teach Pendant for Robot Glazing SystemBy Seungyeol Lee
Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc
Aug 1, 2013
-
Falconbridge Limited - Strathcona MillBy Peter Wells, Gordon Marrs, Dominic Fragomeni, Warren Holmes, Daryl Macnamara
"LocationThe Strathcona mill ofFalconbridge Limited is located in Onaping, Ontario, 50 km northwest of Sudbury.GeneralOre from the Falconbridge mines in the Sudbury Basin (Strathcona, Fraser, Onaping,
Jan 1, 2000
-
Beneficiation of Ores at the Flin Flon ConcentratorBy R. F. Coulter
THE Flin Flon concentrating and metallurgical plants (Figure 1) of the Hudson Bay Mining and Smelting Co., Limited, lie adjacent to the town of Flin Flon, on the Manitoba-Saskatchewan border, 400 mile
Jan 1, 1962
-
Engaging Local Communities and Sustainable Social DevelopmentBy Dina M. Aloi
In today?s evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to ?engag
May 1, 2007
-
Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick MineBy Qian Liu
Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra
May 1, 2003
-
Copper Electrowinning at Duisburger KupferhuetteBy H. Kudelka
Copper electrowinning at Duisburger Kupferhuette was introduced in March 1975. The electrowinning plant has a capacity of 10,000 mT of copper cathodes a year. The cuprous oxide feed material is an int
Jan 1, 1977
-
Risk Simulation of Aquifer CO2 Disposal from Thermal Power PlantsBy Samuel Frimpong
Green house gases have become a major concern within the international community over the last two decades due to their potential link to global warming. Carbon dioxide (CO2) is the principal greenhou
May 1, 2001
-
A liquefaction incident in a fill raise: A case studyBy F. Hassani, K. Moozar, J. Ouellet, P. Gauthier
"This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche
Jan 1, 2004
-
Monitoring Wastewater Quality at Falconbridge's Sudbury OperationsBy M. U. Oko
"Monitoring of all the waste streams from Falconbridge's Sudbury Operations to determine whether they meet the required standards, has been performed for many years. By 1969, however, the number of sa
Jan 1, 1971
-
Time Domain Reflectometry Measurements of Oil Sands Tailings Water Content: A Study of Influencing ParametersBy A. R. Sorta, D. C. Sego
ABSTRACT Temperature, solute, texture, and thixotropic effects on time domain reflectometry (TDR) measurements of water content in oil sands tailings are investigated. Results indicate that TDR water
Jan 1, 2013
-
Robotic systems development for mining automationBy S. Flewelling, M. Scobie, G. R. Baiden
"SynopsisA feasibility study to develop a research program, the Mine Automation Plan (MAP), was recently completed. This was undertaken by a team comprised of Inco Ltd., Falconbridge Limited, the Cana
Jan 1, 1994