Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining Project Management: Think Second Order!

    By Emmanuel Henry

    Few industries are more challenged by technical, political and market uncertainty than the mineral industry. Technical uncertainty in mining projects concerns the volume and quality of the resource, t

    May 1, 2003

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004

  • CIM
    Kinetic study of methanol oxidation at different temperatures using a new and improved electrochemical cell design

    By R. Baker

    A novel electrochemical half-cell and corresponding working electrode were designed to evaluate the electro-catalytic activities of catalysts in an environment close to that of an operating proton exc

    Jan 1, 2005

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Investigation on Efficiency and Wear with the LCM Centrifugal Mill

    By Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler

    "The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.

    Jan 1, 1985

  • CIM
    Uranium deposits* of the Bancroft area, Ontario

    By J. W. Griffith

    "The mines in the Bancroft area of southeastern Ontario, a few kilometres west of the town of Bancroft, are in Faraday and Cardiff Townships. Three companies, known as Canadian Dyno Mines Limited, Mac

    Jan 1, 1986

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Collector Consumption Heads or Tails

    By J. A. Meech, R. J. Tucker

    "Since the establishment of froth flotation as an effective method of mineral beneficiation there has been both academic and industrial interest in the levels of the various reagents required to perfo

    Jan 1, 1984

  • CIM
    Elaborate Observation and Interpretation of Temperature Dependence on the Singularity of Rock Thermal Conductivity

    "The effective thermal conductivity (ETC) is one of the most important thermo-physical properties of porous media. Due to the lack of higher precision influence of temperature on thermal conductivity,

    Jan 1, 2015

  • CIM
    Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, Alaska

    By Brigitte J. Dejou

    The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in

    May 1, 2006

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    Integration of Mine Automation Systems (14a2af3f-2f3a-4e90-8e97-b85389e6d04a)

    By Irving Wigden

    The world is fast becoming information based. Mine companies migrate business infrastructures to be handled electronically. Suppliers move onto the worldwide web. In this ?e-world? successful supplier

    May 1, 2002

  • CIM
    Integration of Mine Automation Systems

    By Irving Wigden

    The world is fast becoming information based. Mine companies migrate business infrastructures to be handled electronically. Suppliers move onto the worldwide web. In this ?e-world? successful supplier

    May 1, 2002

  • CIM
    McWatters mine

    By M. E. Wilson

    "The property of McWatters Gold Mines, Limited, is in the east-central part of Rouyn township and about 6 miles east-southeast of the town of Rouyn. It includes 35 claims, the group of 5, staked origi

    Jan 1, 1954

  • CIM
    Development of BIM and Automation Based Total Process For Infra Construction ? The State of the Art in Finland

    By R. Heikkilä

    A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the developme

    Aug 1, 2013

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Processing of Copper Sulphide Ores and Concentrates Resulting in the Production of High-Grade Matte and Rejected Slag in one Unit - Two-Zone V Aniukov Furnace

    By V. F. Kozyrev, L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS has developed a new process and equipment for melting copper raw material in a two-zone Vaniukov furnace resulting in the production of white matte and low-grade slag in term

    Jan 1, 2007

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • CIM
    Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit

    By V. Lakshmanan, Dan Mackie, J. Melnbardis

    "Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid

    Jan 1, 1984