Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist
By James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Foundations For The M25 Motorway Near To Heathrow Airport
By John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay
By Susheel R. Kolwalkar
A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred
Jan 1, 2008
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange
By Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino
By Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Drilled Pile Design and Installation Challenges in an Urban Environment
By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay
By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall
By Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program
By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
Behavior Of Excavation With Sheet Piling In Soft Clay ? Synopsis
By G. X. Zeng
A calculation programme of finite element method has been developed in order to study the behavior of excavation with sheet piling in soft clay. Based on a series of isotropically consolidated-undrain
Jan 1, 2010
-
Skirt Suction Foundation - Application To Strait Crossings -
By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)
By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? Synopsis
By Y. G. Li
The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c
Jan 1, 2010
-
Installation Of Augered Cast-In-Place Piles - Equipment
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Toward Understanding the Seismic Performance of Rigid Inclusions
By J. Tanner Blackburn, James R. Gingery, Lisheng Shao
Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.
Jan 1, 2018
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational Structure
By Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case History
By Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
Design and Construction of the Thames Water Lee Tunnel Shafts, London
By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014