Damage To Initially Bent Piles ? SynopsisBy B. B. Broms
A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of
Jan 1, 2010
-
Presentation #6 - Rapid Load Testing: A New Choice For Pile TestingBy Michael D. Justason
...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th
Jan 1, 2001
-
BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODSBy Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers
Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali
-
Interdisciplinary And Inventive Approaches To Drilled Shaft RemediationBy William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst
Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t
Oct 1, 2022
-
Design of Pile Foundation for Tall Railway Bridges in North-East IndiaBy Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
Prescriptive Specification Design: The Impact on Cost and Constructability – Case HistoryBy Shawna Munn, Nadir Ansari, Allison Bennett
"This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an
Jan 1, 2017
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Quality Control Of Augered Cast-In-Place And Displacement Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is
Jan 1, 2002
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel ExtensionBy Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? IntroductionBy Richard Short
Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l
Jan 1, 2007
-
A New Method of Quality Control for Construction Joints in Diaphragm WallsBy Nikolaus Schneider
"Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta
Jan 1, 2014
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New MexicoBy SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
Design and Construction of Nysted Offshore Wind Farm, DenmarkBy Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009
-
Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering PracticeBy O. Craciun, C. A. Bridges, M. Cai, J. Sugawara
There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional
Nov 1, 2022
-
Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay CampusBy Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002