    High Speed Photography of Stope Blasting in South African Gold Mines

    By P A. Gibson, J R. Brinkmann

    The South African gold mining industry fires approximately 800 000 sloping blastholes daily. A programme aimed at characterizing the stope blasting process is underway in order to identify areas for i

    Jan 1, 1985

  • ISEE
    The Effect of Precise Millisecond Delay on Fragmentation at the Rock of Ages Quarry

    By Raymond H. Green, Mitchell W. Green

    The authors examined the application of precise millisecond delay electric blasting at a well-known Vermont quarry. The paper explains how the use of a new high-accuracy electric delay detonator has i

    Jan 1, 1986

  • ISEE
    The Use of Nonel Reefmaster Assemblies

    By Kfw Eick

    The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar

    Jan 1, 1990

  • ISEE
    Sensitivity Analysis for Optimum Open Pit Blasting

    By Kai Nielsen

    A model has been developed for sensitivity analysis of open pit bench blasting. The model simulates the cost effectiveness of various blasting designs in relation to the equipment used for drilling, l

    Jan 1, 1985

  • ISEE
    Near-Source Attenuation of Seismic Waves from Spatially Distributed Sources

    By Lewis L. Oriard

    Both theory and experience tell us that spatially distributed energy sources generate a more complex family of seismic waves than do point sources. The resulting effects in the near field (for close-i

    Jan 1, 1992

  • ISEE
    Ammonium Nitrate Blasting Agents from Manufacture to Field Use

    By Fred C. Drury

    The introduction and growth of modern chemical explosives based upon prilled ammonium nitrate has been the most significant development in the explosives industry during the 20th century. These modern

    Jan 1, 1980

  • ISEE
    Blasters Initiate Quality Control of ANFO at the Borehole

    By George E. Jackson

    ANFO, as a blasting agent, is used in large quantities in coal surface mines. It can be purchased on the open market or through reliable suppliers. The blaster in the field must assume that his ANFO i

    Jan 1, 1978

  • ISEE
    Improved Methods of Blasting Concrete for Welland Canal Rehabilitation

    By Ray Jambakhsh, Craig Copping

    The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contract

    Jan 1, 1994

  • ISEE
    Air Blast - An Often Overlooked Cause of Structural Response

    By Douglas Rudenko

    When blasting complaints come, as an industry we often immediately look to the ground vibration as the source of the trouble. Often times we overlook or place less emphasis on the collected air overpr

    Jan 1, 2002

  • ISEE
    250 Pound Down-Hole Drilling in Hard Rock

    By R L. Calhoun

    A paper on High Pressure Air must start with the industry accepted definition of High Pressure Air and, for the reader who is unfamiliar with High Pressure Air systems, include basic information on wh

    Jan 1, 1976

  • ISEE
    The Evolution of Loading 4 1/2 Inch Diameter Upholes at Kidd Creek No. 1 Mine

    By R Malo, A Yetter

    The use of large diameter blastholes for underground mining began approximately twelve years ago and are now routinely employed in a variety of ore types and stope designs. These large boreholes, rang

    Jan 1, 1984

  • ISEE
    The Bubble Mystery

    By Richard Dooley

    This paper is one sided because it presents the problem, but not the solution. The problem of blisters (bubbles) and occasional tears in caisson liners occurred when blasting and we have not found a c

    Jan 1, 1983

  • ISEE
    New Aspects of Shock Waves in Underwater Blasting

    By Zoltan Susanszky

    The total available energy in an explosive charge is seldom fully utilized in industrial operations. For this reason more explosive is normally used to perform a job than we would calculate. In an exp

    Jan 1, 1976

  • ISEE
    Merging an Open Pit with an Underground Mine

    By Charles L. Greening

    MARTIN MARIETTA CEMENT at Martinsburg, West Virginia, has been and presently is engaged in coupling present open pit with old underground workings. Various drilling and blasting techniques have been i

    Jan 1, 1982

  • ISEE
    Blasting Permanently Frozen Asbestos Ore in Northern Canada

    Almost one half of Canada's total land surface is underlain by permafrost. This term describes the thermal condition of earth materials when their temperature remains below 0°C continuously for a numb

    Jan 1, 1975

  • ISEE
    Removal of the Top of an Aged Water Supply Reservoir By Explosives

    By Chuck Kliche, Bill Clements

    This project involved the removal of the top of an old water supply reservoir tank for the City of Lead, SD by explosives. The general contract called for the removal of the concrete top without damag

    Jan 1, 2007

  • ISEE
    String Loading at Vale

    By Jennifer Paukula, Steven Lindsay, S. Joon Kim

    String loading is the placement of a bead or ‘string’ of emulsion along the lower edge of a development drill hole. The loading hose extraction rate controls the amount of emulsion placed in each dril

    Jan 1, 2012

  • ISEE
    Real-Time Prediction of Meteorological Effects on Airblast Levels

    By Adrian Moore, Alan Richards

    A real-time system for prediction of the effect of meteorological conditions on airblast overpressure levels has been established in the Hunter Valley Coalfield in Australia. Real-time meteorological

    Jan 1, 2009

  • ISEE
    Municipal Blasting: Blast Design, Vibration Monitoring & Control

    By Frank Lucca

    This paper includes research and investigation into blast design and blast optimization for vibration control in municipal and tight blasting situations, where specifications were extremely stringent.

    Jan 1, 2004

  • ISEE
    Reducing a Quarry Global Carbon Footprint through Blast Optimization

    By Pierre DePasquale, Ricardo Chavez

    Lowering of quarry energy consumption participates to answer both environmental and financial issues. The “EE-Quarry” European project, supported by the European Commission (EE stands for Energy Effic

    Jan 1, 2015