    Airdek: an Update

    By Michael D. McGill, John L. Turner, Don Sieger, Doyle Newhouse

    Since its introduction by Atlas Powder Company in late 1986 as a means of highwall stabilization in surface coal mines (1), applications of the basic AirDek (2) blasting technique have multiplied rapi

    Jan 1, 1991

  • ISEE
    Blasting 250 Feet from a Historic Structure

    A case history is presented where a variance was permitted by the court to change a 500 foot limit to 250 feet for blasting overburden at a surface coal mine in the proximity of a historic structure.

    Jan 1, 1991

  • ISEE
    Blasting a Very Big Boulder Under Adverse Conditions

    By Brad Johnson

    Homestake Mining Corporations' open cut operation at Lead SD. experienced a highwall failure in October of 1993. The failure released a 75' section of rock wall at the 5280' level. It came to rest on

    Jan 1, 1995

  • ISEE
    Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain Gulf

    By J S. Brower

    Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.

    Jan 1, 1978

  • ISEE
    Controlled Sequential Blasting

    By E Emery Jr Gray

    A need for more delay periods other than those normally manufactured throughout the explosives industry rarely occurs. This paper will discuss one such incident from an analytical view through practic

    Jan 1, 1976

  • ISEE
    Overview of the UNI Tronic™ Electronic Blasting System

    By Albert van Niekerk, Mick Lownds

    Overview of the UNI Tronic™ Electronic Blasting System

    Jan 1, 2004

  • ISEE
    The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test Site

    By Don Larson, Gordon Coleman

    The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli

    Jan 1, 1994

  • ISEE
    Blasting Practices at the Fording River Operations

    By Murray B. Lytle

    The Fording River Operations of Fording Coal Ltd. in southeastern British Columbia is producing 45 million long tons of clean metallurgical coal for shipment to the Japanese steel industry on a 15 yea

    Jan 1, 1978

  • ISEE
    Everglades Nutrient Removal Project

    By Philip M. E Thomas

    For over sixty years man has struggled to defeat the natural swamp lands known as the Florida Everglades as demand for land to support the burgeoning population growth in the state continued almost un

    Jan 1, 1994

  • ISEE
    Vibration prediction from controlled blast tests

    By Nadir Plasencia, Rogerio: Neves Mota

    The evaluation of vibrations induced to build structures is one of the main concerns when dealing with blast works. EDP, the main Portuguese producer of electricity is presently incrementing energy pr

    Jan 1, 2008

  • ISEE
    Retardation of an Underground Coal Fire in an Industrial Area by Means of Blasting

    By Claude Cunningham

    Late in 1982 a fire began in the shallow, abandoned workings of the Uitkyk Colliery near Witbank, South Africa. Urgent measures had to be taken to quench the fire, before the surface caving it caused

    Jan 1, 1984

  • ISEE
    Explosives Safety is a New Ball Games

    By Joe Dannenberg

    One must be cautious in talking about blasting safety, because the very act of making a blast involves the creation of an infernal machine. You are setting up for the instant release of tremendous ene

    Jan 1, 1975

  • ISEE
    The Use on Nonel Primadets for Blasting Initiation at the Magma Superior Mine Superior, Arizona

    By Peter P. Harvey

    The Nonel Primadet is a non-electric delay blasting cap initiation system. The most recent field application of the system in the Southwest has been at the Magma Superior Mine, Superior, Arizona.

    Jan 1, 1978

  • ISEE
  • ISEE
    Reduced Ore Dilution by Controlled Split Round Blasting in Underground Uranium Mining

    By John R. Jr Tripi, Paul N. Worsey

    Split round blasting is commonly practiced in underground uranium mining in the Big Indian ore belt located in Southeast Utah. The technique is used to prevent ore dilution by separately blasting the

    Jan 1, 1985

  • ISEE
    An Economic Analysis of Cast Blasting Compared to Other Stripping Alternatives

    By J Lyall Workman

    This paper examines the comparative economics of cast blasting to alternative stripping techniques. There are several scenarios where a mine may consider introducing cast blasting. However, there are

    Jan 1, 1998

  • ISEE
    Lubrication of Rotary Rock Bits

    By J MacPhail, H Gardner

    This paper discusses reasons why users of rotary air blast hole bits encounter premature bit failure due to bearing failure. It also discusses a lubrication system designed for rotary rock bits to com

    Jan 1, 1996

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996

  • ISEE
    Blasting at the Valdez Creek Placer Mine, a Cost Savings Design for Sub Arctic Conditions

    By William E. Hill

    The blasting program at the Valdez Creek Placer Mine must deal with challenging situations throughout the year. During the short summer, extreme water conditions must be confronted, while the winter m

    Jan 1, 1994

  • ISEE
    The Use of Statistically Designed Experiments to Conduct Effective Small Diameter Crater Studies

    By Cathy McGinley, John Mullay, Clark Stancavage

    The use of crater studies to evaluate explosive performance is a well-established practice in the Blasting Industry. Normally, this work utilizes larger charge sizes (>75mm) in order to minimize the i