Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • ISEE
    Within a Stones’ Throw

    By James Goldberg, Mark Withey

    The Material Service Thornton quarry is a multi-million annual production tons complex. Surrounded by busy surface highways, and divided by a railroad on the north/south axis and further divided by a

    Jan 1, 2006

  • ISEE
    Optimization of Equipment Exclusion Zones in Mining Blasting Processes Through Predictive Analysis and Field Validation

    By Orica Peru, Pedro Lozada

    Proper management of exclusion zones in blasting operations is essential to ensure safety without compromising operational efficiency. In Peru, mining regulations establish minimum exclusion distances

    Jan 26, 2026

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • ISEE
    The Role of Stress Waves and Fracture Mechanics in Fragmentation (365338ef-2790-4b50-a1d1-180b1215f11d)

    This paper will review some of the work conducted in the past at the Dynamic Effects Laboratory to examine the use of stress waves and fracture mechanics in understanding dynamic fracture and fragment

    Jan 1, 2015

  • ISEE
    The Effects of Short Delay Times on Rock Fragmentation

    By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson

    "Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements

    Jan 1, 2016

  • ISEE
    Blast Design and Quality Control Procedures at Atomic Energy of Canada Limited's Underground Research Laboratory

    By P A. Lang

    Canada is constructing an Underground Research Laboratory as part of a comprehensive program to evaluate the concept of nuclear fuel waste disposal deep in stable rock formations. Careful blasting met

    Jan 1, 1987

  • ISEE
    Non-Ideal Detonation Modelling of Ammonium Nitrate-Based Explosives

    By Paulo Couceiro

    Highly non-ideal explosives usually tend to react expressively below their ideal detonation velocities. In these cases, dimensional effects and product heterogeneities become important to proper model

  • ISEE
    Seismic Blasting Between the North Poles

    By Lloyd Litwin

    The ARTA 2008 Project (Alpha Ridge Test of Appurtenance) was a Canadian Government sponsored deep water seismic survey carried out on the high arctic permanent polar ice cap. This Geological Survey of

    Jan 1, 2011

  • ISEE
    Seismic Section- Video Review - Understanding Vibrations from Blasting

    By Keith Pucalik

    Understanding Vibrations fr om Blasting focuses on explaining blast vibrations and their effects on people and homes while keeping an eye on the importance of the use and significance of explosives i

    Jan 1, 2004

  • ISEE
    Momentum Theory – A New Calculation of Blast Design and Assessment of Blast Vibrations

    By Robert Boehnke, Bernd Mueller

    Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation

    Jan 1, 2003

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • ISEE
    Impact of Blasting on Downstream Process to Maximize the Profitability of Mining Industries

    By Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet

    The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various

    Jan 1, 2019

  • ISEE
    Predicting Rotary Drill Performance

    By George P. Jr Schivley

    Looking at the process of drilling rock from the standpoint of the power required, yields an equation that relates Force-on-the-Bit; Torque, to rotate the bit; and bit Angular Speed to the Penetration

    Jan 1, 1994

  • ISEE
    The Median Versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model (8c6eb78e-36ab-4850-9d6b-ecb1792625f3)

    By F Ouchterlony

    Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version

    Jan 1, 2016

  • ISEE
    Optimization of Fragmentation in benches for Dragline deployed in large opencast coal mines- A case study of Indian mine

    By Rajesh Sonkar, Sanjeev Kumar

    The deployment of Dragline machines in opencast coal projects involves huge capital expenditure as well as operating costs. The mine operators always endeavor to ensure smooth excavation of material b

    Jan 1, 2011

  • ISEE
    Pump Protection Systems on Mobile Equipment

    By Tom Watts

    This paper will focus on the design, manufacture and use of pump safety systems on MMUs (Mobile Manufacturing Units – Bulk Trucks) with progressive cavity pumps. The practice of pumping bulk blasting

    Jan 1, 2009

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Journal: Safety Talk / Standard Operating Procedures

    By Wm. Reisz

    There is no universal standard for Standard Operating Procedures (SOP’s). Every blasting operation has its own unique circumstances, its own methodologies and its own unique demands. It would be nearl

    Jan 1, 2010