Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces

    By I. Mc Dougall

    Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,

    Jan 1, 2007

  • SAIMM
    The Recovery Of Chrome And Manganese Alloy Fines From Slag

    By J. H. Van Reenen, H. Thiele, C. Bergman

    For some time spirals have been the process equipment chosen to recover metal in the size range 0.15 to 3mm from ferrochrome and silico/ferro manganese slags. Recoveries of metal obtained using spiral

    Jan 1, 2004

  • SAIMM
    Trithiocarbonates For PGM Flotation

    By C. F. Vos, J. D. Miller, J. C. Davidtz

    Small replacements of C12-trithiocarbonate (C12-TTC) for dithiocarbonate (DTC)/dithiophosphate(DTP) in a reagent suite for the flotation of platinum group metals (PGM) have significantly improved the

    Jan 1, 2006

  • SAIMM
    Scraper winch pull force investigation

    By D. Janicijevic

    This paper describes the process of scraper winch pull force measurement and shows the results of the actual winch pull force in extreme stall situations as well as during the face and gulley cleaning

    Jan 1, 2008

  • SAIMM
    Dynamic events in roof strata—Occurance and prevention

    By J. Drzewiecki, J. Kabiesz

    Coal mining using longwall methods of mining can lead to intense disturbances of undermined roof strata. The disturbances may extend beyond the extraction area and the resulted rock mass deformations

    Jan 1, 2003

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • SAIMM
    Factors Affecting the Mechanical Efficiency of Men Shovelling Rock in Stopes (b51e842f-bed0-44c2-8efb-860e65d7b779)

    By J. H. Viljoen, A. Heyns, J. F. Morrison, C. H. Wyndham, N. B. Strydom

    Discussion M. J. Martinson* (Associate Member): This is another interesting paper in the series which the Human Sciences Laboratory is publishing on the physiological cost of the more strenuous manua

    Jan 10, 1969

  • SAIMM
    An Improved Dc-Arc Process For Chromite Smelting

    By J. P. W. Bennie, A. de Jong, G. M. Denton

    Mintek together with Middelburg Steel & Alloys, developed the DC arc furnace process for the production of ferroalloys with the expressed objective of smelting ore fines (<1mm) without the need for ag

    Jan 1, 2004

  • SAIMM
    Geostatistical Techniques for Improved Management of Brickmaking Clays

    By M. H. M. von Wielligh

    "Brick manufacturers supply a variety of uniquely coloured facebricks to the building industry, which requires a high level of colour consistency in the products. Colour variation in bricks is influen

    Jan 1, 2017

  • SAIMM
    Review, Evolution and Optimization of the Kansanshi Mixed Copper Ore Treatment

    By C. Chongo, F. X. Paquot, C. Ngulube

    "Over the last six years, the Kansanshi copper/gold mine has continued to process significant quantities of complex transitional mixed ores. The effect of the complex mineralogy on the flotation perfo

    Jan 1, 2015

  • SAIMM
    Annual General Meeting of the Institute

    The Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 24th August, 1977. Dr M. D. G. Salamon (President) was in the chair and dec

    Jan 1, 1978

  • SAIMM
    A Twin-Cathode Dc Arc Smelting Test At Mintek To Demonstrate The Feasibility Of Smelting FeNi From Calcine Prepared From Siliceous Laterite Ores From Kazakhstan For Oriel Resources Plc

    By H. Lagendijk, I. J. Reinecke

    Mintek was contracted by Oriel Resources plc in 2004 to conduct a preliminary assessment study on smelting ferronickel from the large but relatively low grade Shevchenko nickel ore deposit in Kazakhst

    Jan 1, 2007

  • SAIMM
    Kinetic Studies On The Leaching Reactions In The Autoclave Circuit Of The Tati Hydrometallurgical Demonstration Plant

    By B. D. Paphane

    Since the commissioning of the Tati Hydrometallurgical Demonstration Plant (HDP), which produces Ni and Cu cathodes as well as Co salt from sulphide concentrate employing Activox® technology for leach

    Jun 1, 2013

  • SAIMM
    Electrical Energy Management In The Ferroalloy Business

    By P. J. Brereton-Stiles, M. S. Rennie, N. Singh

    Ferroalloy producers are large-scale users of electrical energy, which in many countries is in short supply and increasingly expensive. Preheating and/or pre-reduction using natural gas, recycled furn

    Jan 1, 2004

  • SAIMM
    Surface parameters for quantifying the hydro-mechanical anisotropy of rock discontinuities

    By W. Robert, J. Wirth, G. Grasselli

    ABSTRACT: Strength, deformability and fluid flow properties of rock joints are to a great extent controlled by the surface roughness. The hydraulic conductivity of a rock fracture depends on the aper

    Jan 1, 2003

  • SAIMM
    1.2 McWha - Manufacture And Use Of Reference Materials

    By Mike McWha

    Drivers to increasing RM use ?Compliance issues ?Section 12 JSE Listing Rules ?Canadian NI 43-101 ?Sarbanes Oxley ?Shortage of African ore reference materials ?Poor perceptions about quality

    Jan 1, 2005

  • SAIMM
    Modelling Of Thermal Profile In Submerged-Arc Furnace And The Influence Of Composition Of Ore On The Thermal Profile

    By K. M. Godiwalla, S. Ranganathan

    The thermal state in submerged-arc furnaces (S.A.F.) producing ferro alloys is important for the conditions of both the grade of alloy produced as well as specific energy consumption. The temperature

    Jan 1, 2007

  • SAIMM
    Metals And Alloys Water Solidification A Bridge From Pyro- To Hydro-Metallurgy

    By David Norval

    The increased tendency to use hydrometallurgy as an extraction step towards final refining following a pyrometallurgical smelting process requires melts which have to be cast and or comminuted which c

    Jan 1, 2005

  • SAIMM
    A New Bubble Pick-up Technique as a Rapid Flotation Test Method

    By A. F. Lee

    A pick-up apparatus capable of yielding quantitative results has been described. Studies of some collector-mineral systems have been presented to illustrate the versatility of the apparatus and prove

  • SAIMM
    Direct Smelting Of Stainless Steel Plant Dust

    By T. J. Goff, G. M. Denton

    Mintek has developed the EnviroplasTM process for the treatment of solid wastes from the metallurgical industry, especially steel plant dusts, without requiring agglomeration to produce inert slag and

    Jan 1, 2004