Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hobson And Rosedale Tunnels?New Technology In Auckland
By Harry Asche
The last 12 months has seen the construction of the first Earth Pressure Balance (EPB) TBM excavated tunnel in New Zealand on the Project Hobson sewer storage tunnel for Watercare Services Limited, wi
-
Efficiency Improvement Process for Aggregate and Industrial Mineral Processing Plants
By M. Rotz
In the minerals industry today, the ?low hanging fruit? that once existed to debottleneck production and improve recovery, while meeting market needs for quality in mineral processing operations, are
Feb 23, 2014
-
Discussion – Determination of the Optimum Lifetime of a Mining Project Using Discounted Cash Flow and Option Pricing Techniques – ME Vol.44, No.10 1992, pp.1262-1268 – Cavender, B.
By G. Le Bel
The paper proposes three methods to determine optimum lifetime of a mining project1. The conclusion is that the three methods arrive at the same optimum production rate (by coincidence). It is also st
Jan 1, 1993
-
CFD Analysis on Gas Distribution for Different Scrubber Redirection Configurations in Sump Cut
By J. P. Rider, T. W. Beck, J. A. Organiscak
"The National Institute for Occupational Safety and Health (NIOSH), Office of Mine Safety and Health Research (OMSHR) has recently developed a series of models utilizing Computational Fluid Dynamics (
Jan 1, 2015
-
Geological Parameters Affecting Open Hard-Rock Tunnel Boring Machine Performance
By Taehong Kim
An accurate and reliable prediction of Tunnel Boring Machine (TBM) performances, in terms of Rate of Penetration (ROP), utilization (U), and cutter wear rate, is a critical element in the successful p
Jan 1, 2008
-
The Practical Aspects Of Mine Equipment Replacement Analysis ? Introduction
By Hubert Erik Sherer
Determination of the best time to replace an aging unit of equipment is a recurring problem which is common to essentially all surface and underground mining operations. Virtually all mining equipment
Jan 1, 1982
-
Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144
By N. Paas
Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati
Feb 24, 1997
-
The Many Faces Of Wollastonite
By K. J. Sollman
As a class, silicate minerals have likely found the broadest, if not largest volume, use in combination with polymeric binders of all industrial minerals. Among the silicates, calcium metasilicate, wo
Jan 1, 1993
-
Gold Heap Leach Project At Stibnite, Idaho
By W. L. Josey
The Stibnite Project is an open pit/cyanide heap leach gold property located in the Yellow Pine mining district of central Idaho. The gold ore is in an oxidized zone of an epithermal deposit which is
Jan 1, 1984
-
The Politics Of Fear Governmental Control Of Coal Mining
By David S. Smith
Almost nine years after the assertion of enormous and pervasive federal control over coal mines by means of the Federal Coal Mine Safety and Health Act of 1969, 30 USC Section 801 et seq, as amended b
Jan 1, 1979
-
Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024
By Bernd Hagenah, Eric C. Wang
New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons
Jun 23, 2024
-
Characterization of San Diego’s Stadium Conglomerate for Tunnel Design
By S. J. Boone, A. Poschmann, C. Pound, A. Pace
San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper
Jan 1, 2001
-
Incorporating operational modes into long-term openpit mine planning under geological uncertainty
By Alessandro Navarra, Aldo Quelopana
Sophisticated models have progressively been developed to address the challenges related to long-term, openpit mine planning under conditions of geological uncertainty. Prior research has acknowledged
Mar 1, 2025
-
A Basic Factor Estimate Of The Land Area In Alabama Excavated On The Surface For Coal Prior To 1970
By Reynold Q. Shotts
One often sees in the papers, in these days of ecological consciousness, estimates of the quantity of land that has been "devasted," "ruined," or "destroyed," by surface or strip mining, especially fo
Jan 1, 1973
-
Impacts of grade distribution and economies of scale on cutoff grade and capacity planning
By Mustafa Kumral, Mehmet Balci
Strategic mine planning focuses on cutoff grade selection, capacity planning and block sequencing. Despite significant knowledge accumulated, potential value can be added to mineral sourcing by addres
Sep 1, 2024
-
Applicable Analytical Tools For A Seismic Design Of Underground Excavations
By Christopher M. St. John, Tony F. Zahrah
Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu
Jan 1, 1985
-
Mining Trends In Latin America ? Restrictive Policies Slow Developments
By William F. Butler
I propose to do three things today. First, take a broad look at the role of mining in the Latin American economy; then, review briefly the current situation in four principal metallic mineral exportin
Jan 1, 1962
-
American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock
By S. Schina
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme
Jan 1, 2001
-
Eskay Creek Mine And Mill – A Continued Success
By G. Biles, K. Loughran, R. Anand
The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus
Jan 1, 1999
-
Environmental Issues For The Reclamation Of Abandoned Coal Mines In The Appalachian Coal Fields – Preprint 97-179
By Anthony B. Szwilski, Dalip Sarin, Richard D. Begley
This paper will present the results of an analysis of several abandoned coal mine projects and includes field data for over a dozen different reclamation projects recently completed in the state of We
Feb 24, 1997