Roof Bolter Canopy Air Curtain Effects on Airflow and Dust Dispersion in an Entry Using Blowing Curtain Ventilation – A Computational Fluid Dynamics EvaluationBy M. R. Shahan, W. R. Reed, P. Zhang, J. P. Rider
Roof bolter operators may be exposed to high respirable dust concentrations on continuous miner sections with blowing face ventilation when bolting is performed downwind of the continuous miner. One s
Jan 1, 2019
-
Expert Advisor For Phosphate FlotationBy B. E. Davis, D. A. Stanley, C. E. Jordan
A prototype expert advisor was developed by the U.S. Bureau of Mines to systematically offer advice on the control of a Florida phosphate operation. The PC based system receives input from remote sens
Jan 1, 1990
-
Recent Developments In High-Pressure Water-Jet Assisted Cutting Of Rock And CoalBy George K. Schenck
INTRODUCTION Recent advances in high-pressure water jet technology can be effectively employed in mining and tunneling. The new equipment is based on available industrial hardware such as pumps, no
Jan 1, 1983
-
Application of the Observational Method in the T-48 Tunnel Project in the Himalayas - NAT2024By Anuradha Khetwal, Sandeep Khetwal, Andrea Panciera
The observation method is a design optimization approach for the drill and blast method in tunneling. This method includes first identifying the hazard scenarios through site investigation, formulatin
Jun 23, 2024
-
The Application Of Linear Goal Programming To Coal-Fired Power Plant Blending ProblemsBy James E. Lonergan
Linear goal programming is a multi-objective optimization technique where the constraints of a linear programming formulation of a problem are considered as additional objectives. The optimal solution
Jan 1, 1984
-
New Developments In Continuous Haulage ? IntroductionBy D. C. Torre
Ever since the early '60's there have been efforts to develop and produce reliable continuous haulage systems capable of taking the full output of a continuous miner and transporting it, in
Jan 1, 1981
-
Seismic Design Of Underground StructuresBy A. J. Hendron, J. E. Monsees
INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr
Jan 1, 1985
-
Metallogenic Characteristics Of The “Borska Reka” Porphyry Copper Deposit In The Bor Copper And Gold Deposit, East SerbiaBy D. Kozelj
Introduction The porphyry copper deposit “Borska Reka” is the biggest undeveloped deposit in the Timok Magmatic Complex (TMC). Total reserve calculated manually is 611 Mt (cut-off grade 0.3% Cu) of 0
Jan 1, 2007
-
Characteristics of abutment pressures and bolt loads in longwall system: a review on stress/load measurementsBy Ihsan Berk Tulu, Gaobo Zhao, Deniz Tuncay, Syd S. Peng
Longwall mine instrumentation for measuring abutment stress distribution, mining induced immediate roof stress change and deformation, and primary/secondary support loads and deformations provides cri
-
The Role Of The State Of The Art Geology In Discoveries In PolandBy M. Niec
Poland lies at the junction of three geologic provinces: the East European Precambrian platform, the Middle European Paleozoic platform, and the Alpine orogenic belt comprising the Carpathian Mountain
Jan 1, 1996
-
Life-Of-Mine Schedule From Multiple Pits: Case Study For The Tenke Fungurume Mining DistrictBy R. Benito
This paper describes the development of a life-of-mine schedule (LOM) for one of the world's largest known sedimentary copper-cobalt districts located in the Katanga Province, Democratic Republic
Jan 1, 2011
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
Revisiting Scrubbing Unit Operations in the Phosphate IndustryBy F. J. Sotillo
"Scrubbing both horizontal (drum) and vertical (attrition) are considered simple unit operations in the beneficiation of phosphate ores. In general, the operating conditions are fixed at high solids c
Jan 1, 2017
-
Current issues with purported asbestos content of talc: Hydrothermal-hosted talc ores in southwest Montana - SME Transactions 2018By M. E. Buzon, M. E. Gunter
Talc has been the focus of recent civil litigation based on claims that asbestos minerals exist in talc deposits and therefore have caused asbestos-related diseases in those who have regularly used ta
Jan 1, 2018
-
Current issues with purported asbestos content of talc: Hydrothermal-hosted talc ores in southwest Montana - SME Transactions 2017By M. E. Buzon, M. E. Gunter
Talc has been the focus of recent civil litigation based on claims that asbestos minerals exist in talc deposits and therefore have caused asbestos-related diseases in those who have regularly used ta
Jan 1, 2017
-
The Theory And Development Of A Slurry Ash Analyzer At The Laboratories Of The Outokumpu, Oy, FinlandBy S. K. Kawatra
Outokumpu Electronics has designed a new on-line coal slurry ash analyzer, based on an instrument developed at Michigan Technological University. The primary goal was to build an accurate instrument a
Jan 1, 1992
-
The Louvicourt Cu-Zn-Ag-Au Volcanogenic Massive Sulphide DepositBy D. S. Bubar
This presentation will represent a diversion from the central theme of Cordilleran geology, in both time and space, as we move 2,000 miles east of Spokane to eastern Canada, specifically the province
Jan 1, 1991
-
Evaluation of Settlement Monitoring Over 6.75 Miles of Tunneling - Updating Prediction Methods and Designing Better Monitoring ProgramsBy Lynn Salvati, Colin LaVassar, Loic Galisson, Joel Theodore, Lynette Sla
"Sound Transit’s University Link and Northgate Link projects will add 6.75 miles (10.9 km) of twin-bored tunnel to Seattle’s light rail system, extending the route north from downtown Seattle. The tun
Jan 1, 2016
-
Cutoff Grade Optimization (PREPRINT NUMBER 93-247)By K. Dagdelen
The definition and shortcomings of traditional cutoff grades are discussed. The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a mi
Jan 1, 1993
-
Raise ClimbersBy Hans Svensson
INTRODUCTION The Alimak method of raising (Fig. 1) was intro¬duced in 1957. Because of its flexibility, economy, and speed, it soon became the most used system of raising in the world. With the sam
Jan 1, 1982