Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Manganese Oxide Coated-Media For Removal Of Soluble Manganese In Mine Drainage

    By Felicia F. Peng

    The naturally occurring aged manganese oxide coated on the granular media was found to have a catalytic effect on the removal of low concentration of Mn(II) (-1 ppm) from drinking water. Applying this

    Jan 1, 1994

  • SME
    Evaluation Of Hyperbaric Filtration For Fine Coal Dewatering: Part I (2bf50cb1-82b0-4a2c-86af-5ff91aefd198)

    By J. G. Groppo

    Hyperbaric filtration was evaluated at the laboratory scale for dewatering fine coal cleaned by froth flotation. A laboratory pressure filtration procedure is described to obtain uniform cake structur

    Jan 1, 1994

  • SME
    Effects of the Constant Mine Strata Temperature Assumption and Initial Mine Air and Strata Temperatures on Refuge Alternative Internal Air Temperature

    By P. T. Bissert, L. Yan, M. D. Klein

    "Federal regulations require the installation of refuge alternatives (RAs) in underground coal mines. Mobile RAs have a limited ability to dissipate heat, and heat buildup can lead to a life-threateni

    Jan 1, 2016

  • SME
    Environmental Dredging For The Remediation Of Areas Degraded By Illicit Mining In The Quito River Basin, Colombia - SME Annual Meeting 2022

    By S. Fernández, L. Klinger, T. Vallejo

    In the municipality of Rio Quito, department of Chocó, Colombia, alluvial gold has been illegally exploited by suction dredging. The project consists of using geospatial techniques to identify degrade

    Mar 2, 2022

  • SME
    Quantifying The Increase In Adhesion Strength Of Shotcrete Applied To Surfaces Treated With High-Pressure Water (bdf546c6-606f-4249-9263-9ff9e5eef532)

    By M. E. Kuchta

    Research is currently being conducted at the Colorado School of Mines in the use of high-pressure water for scaling down loose rocks in underground mine openings. In addition to improved miner safety,

    Jan 1, 2002

  • SME
    Mining : The Decade Begins With a Difficult Year

    By M. J. Garcia, Howard Hallman, G. M. T. Marshall, Ken Higby, Louis Cope, Robert S. Hess, John Peters, A. G. Law, William C. Larson

    After a good year in 1979-strong mineral demand, adequate prices for most metals, minimal labor problems-1980 was not so good. The US produced $24.8 billion worth of nonfuel minerals last year, up 3.5

    Jan 5, 1981

  • SME
    The Role Of Bacterial Alteration In Whitening And Iron Removal From Georgia’s Commercial Kaolin Clays

    By E. Shelobolina, S. M. Pickering, J. E. Kogel

    A long history of weathering and bacterial alteration processes have transformed Georgia’s Coastal Plain kaolins from dark organic muds to recrystallized white pigment-grade industrial clays. A seque

    Jan 1, 2002

  • SME
    In Situ Copper Mining at Santa Cruz – A Project Update

    By Tim O’Neil

    The US Bureau of Mines and the Santa Cruz Joint Venture (SCJV) are working on a production-scale, in situ copper recovery project in Arizona. The research is being conducted at the Santa Cruz site, lo

    Jan 1, 1991

  • SME
    Bulk Material Handling At Inspiration Copper Smelter ? Introduction

    By Solomon J. Salat

    During the major expansion of the Inspiration smelter, which took place in 1973, the bulk material handling system underwent a matching expansion in order to move the required materials. Inspiratio

    Jan 1, 1979

  • SME
    Morenci Concentrate Leach Plant First Year Review - Preprint 09-028

    By J. Cole

    The Morenci concentrate leach plant construction was completed and successfully commissioned in October 2007. The plant was designed to operate at medium temperature, 160ºC and pressure, 2,100 kPa.

    Jan 1, 2009

  • SME
    Reducing Life Cycle Costs of Active Treatment for Selenium and Arsenic in Mine Waters and Metallurgical Waste Streams

    By O. Lopez

    "Stringent regulations and increased arsenic presence in ore bodies being exploited have created the need for cost effective and environmentally compliant technologies to remove selenium and arsenic f

    Jan 1, 2015

  • SME
    Dimensionality In Ball Mill Dynamics

    By N. Arbiter

    The theoretical analysis of tumbling mill energetics and performance has largely neglected mill dimensionality, and, in particular, the importance of the length/diameter ratio. This is in spite of the

    Jan 1, 1990

  • SME
    Economics of electric power may make cogeneration a major future power source

    By Earl Rau

    Introduction Will cogeneration be a major power source in the future? The location of electric power generating plants has changed. In 1900, more than 50% of electricity was generated by industria

    Jan 7, 1987

  • SME
    Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories

    By Stephen Phillips, Luigi P. Gonano

    Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.

    Jan 1, 1983

  • SME
    Photogrammetry method for fast and accurate measurement of strata movements and deformations for scale physical mining simulations

    By Yi Luo, Jian Yang, YUJIA LIAN

    Scale physical models, constructed according to the principle of similarity theory, are widely used to simulate the mining disturbances to surrounding strata and to evaluate the effectiveness of imple

  • SME
    The Utilization Of On-Line Analyzers At The Blair Athol Coal Mine, Queensland, Australia

    By G. France

    The Blair Athol Coal Mine (BAC) is a large open cut operation in the Bowen Basin of Queensland, Australia. Current mine capacity is about 11 million tonnes per annum(Mtpa) of export coal. On-line a

    Jan 1, 1999

  • SME
    Architecture in a High-Tech Underground Structure Design - Naples Experience

    By Ignazio Carbone

    "During the design of a typical modern subway, engineering aspects prevail since underground structures remain hidden to most humans. Aligning the advanced architectural concepts with the engineering

    Jan 1, 2016

  • SME
    Optimal Strategies For Leach Pad Injection Operations

    By J. Winterton

    Cripple Creek and Victor Gold Mining Co. is developing a full-scale pad injection program as part of the overall operational plan for the Valley Leach Facility. As part of the development process the

    Feb 27, 2013

  • SME
    Indicator Conditioned Estimator (25d65824-d33d-4da1-8117-5abe26a82e3f)

    By H. Zhu

    Qualitative and interpretative information as obtained from geological and/or geophysical studies, in addition to precise measurement, is incorporated into the estimation process through an indicator

    Jan 1, 1989

  • SME
    Geotechnical Baseline Reports?A Review

    By T. Freeman

    In the past ten years, the Geotechnical Baseline Report (GBR) has arguably become the key document for tunnel construction. This report not only allocates much of the risk involved with the work, it s