Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Pilot study on the influence of the eccentric speed on cone crusher production and operation (edb7524e-49ff-4eb7-a7e1-0da505b43724)

    By D. Jacobson

    There are many different machine design parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the speed at which the cone gyrate

    Dec 1, 2013

  • SME
    Analysis of the impacts of mining sequence and overburden depth on stability at a dipping limestone mine

    By B. Slaker, M. M. Sears, G. Rashed

    Ground falls represent a significant hazard at underground mines in the stone, sand and gravel (SSG) sector in the United States. Researchers from the U.S. National Institute for Occupational Safety a

  • SME
    Cu Isotope Fractionation In Exploration Geology And Hydrometallurgy: Examples From Porphyry Copper Deposits

    By R. Mathur

    Cu isotope fractionation in low-temperature aqueous environments has been well documented. Here Cu fractionation was applied to two distinct, yet related, mining problems. First, an exploration geolo

    Jan 1, 2012

  • SME
    Shotcreting Automation

    By T. M. Karppanen

    Shotcrete is used both in mining and tunnelling for supporting rock. Both dry and wet processes are used for shotcreting, and each produces good quality concrete. Thick shotcrete layers function a

    Jan 1, 1989

  • SME
    A preliminary evaluation of a through-the-earth (TTE) communications system at an underground coal mine in eastern Kentucky

    "A commercially available through-the-earth (TTE) communications system was evaluated at an underground coal mine in eastern Kentucky. This field study was conducted as part of a larger multisite eval

    Apr 1, 2016

  • SME
    Groundwater Pressure Consideration on Partially Drained Tunnel Lining Rehabilitation Design - NAT2022

    By Irwan Halim, Young Jin Park

    A new tunnel lining was designed for rehabilitation of the existing unlined Weehawken Tunnel in New Jersey. Structural assessment using beam spring models was performed for the lining design as a drai

    Dec 1, 2022

  • SME
    Process Simulation to Enhance Complex Flowsheet Development: Examples in Biotechnology

    By D. Morin, J. Villeneuve, S. Foucher

    The development of new processes has to follow "best practice" rules in order to be technically and economically as efficient as possible. However, innovations, new process routes and new rules are co

    Jan 1, 2000

  • SME
    Mine Shaft Conveyance Monitoring (f0f1bf77-fd16-4f91-b699-be3b3d7f3509)

    By T. M. Ruff, W. G. McCoy, M. J. Beus, S. Iverson, W. Hasz

    Technology to enhance safety during mine hoisting has been developed by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health. Assessment of curre

    Jan 1, 1999

  • SME
    Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical Approach

    By Sunil Bodakunta, Sreenivasa Rao Islavath

    The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu

    Apr 28, 2022

  • SME
    Red Mountain No. 3 - Discovery Of The Ore Body, Ouray County, Colorado

    By James Matlock

    The announcement of a minable reserve of 13.6 Mt (16 million tons) averaging 0.9 g/t (0.027 oz per ton) Au and 2.4 g/t (0.71 oz per ton) Ag for the open pit-heap leach reserve at Red Mountain No. 3 in

    Jan 1, 1990

  • SME
    Investigation Of Heat Transfer On A Deep Level In The Butte District

    By Eugene C. Robertson

    The exchange of heat from wall rock to ventilating air was studied in a cross-cut driven through fresh rock on the 4600 level of the Kelley Mine, Six- teen thermocouple probes, 10 inches long, twenty-

    Jan 1, 1970

  • SME
    Profitable copper production from low-grade waste ores

    By P. I. James, M. R. Baker

    This paper examines new copper production from waste-grade ore using Blue Planet Strategies’ DEMET™ (Dynamic Electrode Mining Effluent Treatment) technology, which aims to bridge the practical weak pr

    Jan 1, 2014

  • SME
    Nuclear Process Control Gauges In Industry ? Introduction

    By Heinz C. Dittmar

    The phenomenon of radioactivity has been known since the turn of the last century. Scientists of many nations, intrigued by the strange effects of radioactivity, have engaged in research to probe the

    Jan 1, 1966

  • SME
    European Vs. United States Construction Contracting Practices

    By Sol Ribakoff

    In 1973, the Subcommittee on Contracting Practices, U. S. National Committee on Tunneling Technology, National Academy of Sciences, under the able chairmanship of A. A. Mathews, Engineering Consultant

    Jan 1, 1981

  • SME
    The Interdependence Of Economic And Hydrologic Criteria In Planning Water Resources Development

    By S. W. Mao

    Hydrologic and economic criteria figure in many obvious ways in water resources development, but they are rarely linked quantitatively, and most of the applications are pertinent only to the case-in-p

    Jan 1, 1967

  • SME
    Determination Of Optimum Iron Ore Mining Policy In Turkey By Using Analytical Network Process

    By M. Yavuz

    Due to workability difficulties, people have begun to use iron ore much later than gold, copper and bronze. In addition, iron and steel products are the most commonly used metals which are necessary f

    Jan 1, 2010

  • SME
    Mine Operating In Bisbee

    After World War I the character of my mining life changed completely. Before then adventure had been almost continuous but after the war there was lots of staying in one place, almost routine, between

    Jan 1, 1976

  • SME
    An ad hoc solution to the transition mine problem

    By W Medina, G Angulo, A Anani

    A current challenge faced by the mining industry is solving the integrated transition mine problem (TMP) that maximizes the net present value (NPV). This study aims to develop an optimization framewor

    Jun 25, 2023

  • SME
    The Co-Disposal of Waste Rock and Tailings

    By L. L. Newman, K. D. Ferguson

    Traditional methods for mine waste management produces two waste streams and the construction of separate disposal facilities. Tailings impoundment design is usually controlled by physical stability p

    Jan 1, 2000

  • SME
    Nonlinear Finite Element Analysis Of Blade-Formation Interactions In Excavation

    By O. F. Brown

    Excavation and loading are primary operations in the surface mine production chain, constituting a significant component of production costs. This makes excavation and loading important cost centers t

    Jan 1, 2012