Construction And Design Of Drilled Shafts In Hard Pinnacle LimestonesBy Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
Construction Methods, Cushman Tunnel No. 2By F. E. ROGERS
CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the
Jan 1, 1931
-
Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water IntersectionBy M. F. Wells
The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w
Jan 1, 1999
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector FacilityBy Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Construction of a Monolithic Silica Reverberatory Furnace BottomA poured slag bottom is universally considered to be the best type bottom for copper reverberatory furnaces. It is impervious to molten matte and ready for immediate use.When molten slag is not availa
Jan 1, 1939
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F
Jan 1, 2013
-
Construction Of A Watertight Deep Shaft In The Unstable And Water-Bearing Strata Of The Saskatchewan Potash FieldBy Erwin K. Roesner
The difficulties encountered while sinking deep shafts for Potash Mines in southern Saskatchewan have been the subject of several papers in the past. Geological and hydrological conditions of the stra
Jan 1, 1980
-
Construction Of Coal Mine Waste Disposal Systems Consistant With Environmental RegulationsBy Richard E. Lounsbury
Coal mine refuse handling traditionally has been the redheaded stepchild of the industry - a problem to be ignored as much as possible. During the past few years, however, mining companies have become
Jan 1, 1973
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - SynopsisBy A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005
-
Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CABy Jeremy Theys
The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Construction Of Explosion Resistant Seals – Preprint 97-83By C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Feb 24, 1997