Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Developing Green Energy Projects in Southern Africa?A Mining Investment ApproachBy M. Seeger
The demographics and the growing numbers of people provide a strong signal that the demand for electrical power in Southern Africa will grow considerably over the foreseeable future. Without a steady
Jan 1, 2010
-
Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired EquipmentBy Jason J. Ballentine
This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main
May 1, 2007
-
Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management FacilitiesBy Ian Bruce
Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp
May 1, 2002
-
Developing Solutions to Complex Flotation ProblemsBy B. K. Gorain
"Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed
Jan 1, 2013
-
Developing Solutions To Complex Flotation Problems (INTERNATIONAL MINERAL PROCESSING CONGRESS (IMPC) 2012 PROCEEDINGS / NEW DELHI, INDIA)By B. K. Gorain
Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed t
Sep 1, 2012
-
Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal MinesBy K. H. Brandt
A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie
Jan 1, 2004
-
Development and application of new technology for 3D Geomechanical model test of large underground group cavernsBy S. Jiansheng, H. Nakayama, D. Lu, A. Wang
ABSTRACT: New techniques and methods for 3D geo-mechanical model test are presented in this paper. The new model material NIOS with high density and low cost; the so-called DPSS (Discrete Principal St
Jan 1, 2003
-
Development And Application Of Reservoir Models And Artificial Neural Networks For Optimizing Ventilation Air Requirements In Development Mining Of Coal SeamsBy C. Özgen Karacan
In longwall development mining of coal seams, planning, optimizing and providing adequate ventilation are very important steps to eliminate the accumulation of explosive methane-air mixtures in the wo
-
Development And Application Of The Coal Mine Roof Rating (CMRR)By Gregory M. Molinda
The Coal Mine Roof Rating (CMRR) was developed 10 years ago to fill the gap between geologic characterization and engineering design. It combines many years of geologic studies in underground coal min
Jan 5, 2007
-
Development and Benefits of Interactive Learning Systems on Atlas Copco EquipmentAtlas Copco Construction and Mining Australia identified a number of issues in regard to the skill levels, labour turnover and productivity of our service technicians. In 1994 we were experiencing a l
Jan 1, 1998
-
Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. CoalfieldsBy P. Schilizzi, A. Jarosz, M. Karmis
This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide
Jan 1, 1986
-
Development and Construction Update of the Grasberg Block Cave MineBy A T. Yuniar, C A. Brannon, N D. Pascoe, H H. Firdausi
This paper describes the key components of the Grasberg Block Cave (GBC) mine design and the development and construction status of the mine. Drawpoint production from GBC will be initiated in 2018 fo
May 9, 2016
-
Development And Demonstration Of Fine Coal Cleaning Circuit OptimizationBy S. Hadley, M. Placha, M. Mishra, V. Choudhry
Under a DOE-funded project, four advanced flotation technologies (the Jameson cell, the Outokumpu HG Tank Cell, an open column and a packed column) were evaluated at the benchscale to identify the tec
Jan 1, 1999
-
Development And Demonstration Of Oxy-Fuel CFB Technology - SynopsisBy A. Hotta
Reduction of CO2 emissions is the key driving force behind the development and implementation of new solutions for energy production. One solution is circulating fluidized bed (CFB) combustion technol
Jan 1, 2012
-
Development and Economic Application of Knelson Concentrators in Low Grade Alluvial Gold DepositsBy R Edwards
Greater efficiency of capture of minus 6 mm to fine micron size particles of free gold is achieved with the Knelson Concentrator. The development, principles of operation and recent innovations relati
Jan 1, 1990
-
Development And Evaluation Of A Urethane Jacketed Tail Roller For Continuous Mining MachinesBy J. Shawn Peterson, David S. Yantek, Adam K. Smith
Occupational noise-induced hearing loss continues to be one of the most pervasive health problems in the mining industry, despite over 25 years of regulation. One of the loudest pieces of equipment u
-
Development and Experiences on Versatile Applications of RD-pile WallBy Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
Development and field testing of a tension measuring gauge for cable bolts used as ground supportBy P. Choquet, F. Miller
"The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a
Jan 1, 1988
-
Development and implementation of a long tendon bolting system utilising resin grouting technologyBy T Sprague, D Pateman
"The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro
Oct 16, 2017
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003