Case Studies on Circuit Design Using Flotation ColumnsBy Glenn S. Dobby, Glenn A. Kosick
"Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr
Jan 1, 1995
-
Case Studies with the Falcon ConcentratorBy G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante
"A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a
Jan 1, 1993
-
Case Study - The Mogiana Quarry ReclamationThis article presents a proposal for the rehabilitation of the mined area of the Mogiana quarry. The Mogiana quarry produces material used in civil construction and is situated in the Brazilian State
Dec 6, 2010
-
Case Study and Hands On with the New DSL2 Electronic Initiation SystemBy Thierry Bernard, J. M. Laboz
2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation and Explosives Applications
Jan 1, 2000
-
Case Study in Monitoring Mining Induced Subsidence Using Photogrammetry and Conventional SurveysBy Rodger C. Fry
Underground coal mining has been active within the East Mountain property since the mid 1950's. As a result, coal from two seams has been extracted within large areas allowing surface subsidence
Jan 1, 1986
-
Case Study in Rock Mass Behavior: TBM versus Drill and BlastBy Scott Chesman
Increased TBM performance is leading the way for resurgence in tunneling activity in NYC. Tunnels will be excavated in the same geologic formations as previously excavated D&B tunnels whose constructi
Jan 1, 2005
-
Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by SurfactantBy H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank
Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen
Jan 1, 2014
-
Case Study Of The Rockpass System At Kloof No. 3 ShaftBy R. Hart
In this paper, problems that have been experienced with the rockpass system at Kloof Mine No. 3 Shaft are described. Actions that have been taken to overcome the problems are also described. These inc
Jan 1, 2006
-
Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern OntarioBy Jérôme Girard, Shiu Kam, Sue Longo
"Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable
Jan 1, 2011
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation ? SynopsisBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for an expansion of the operations. A traditional net present value project valuation methodology had been used th
Jan 1, 2013
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill MineBy David Porter, Nathan Rouse
The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi
Feb 6, 2023
-
Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain SoilsBy Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock MinesBy Reinhold Schnell, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e.,metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the over
-
Case-based reasoning: a catalyst for improvementBy G. S. Pauley
Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: Case-based reasoning can be a catalyst for improvement). A new c
Apr 1, 1994
-
Cast Blasting in the Light of the Electronic OptionBy Winfried Rosenstock
The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi
Jan 1, 2003
-
Casting And Cooling/Crushing Of Silicon Metal And Silicon Alloy At Bécancour Silicon Inc.By D. Ksinsik, R. Boisvert, D. Leblanc
Casting, cooling and crushing/sieving of ferroalloys has followed a well-established pattern in the whole ferroalloys industry for many years. Usually liquid metal or alloys are cast into flat open m
Jan 1, 2004
-
Casualty And Property Concerns For Tunneling ContractorsBy C. N. Greene
I am sure it is obvious to all of you that a complete program of casualty and property insurance is as necessary for any tunneling contractor as it is for anyone else involved in trade in the United S
Jan 1, 1983
-
Cat Tests 360-st 797 Truck, Upgrades Wheel LoadersCaterpillar’s 797 327-t (360-st) mining truck is currently being tested at the company’s proving facilities. Mine evaluations began in the second quarter. The unit will be commerically available in