Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    Working Capital Requirements for Resource Projects

    By Bowra N

    Working capital is best described as money that must be supplied from a company's treasury to buy inventories for raw materials and finished products and to provide credit to customers who ha

    Jan 1, 1986

  • AUSIMM
    Separation of Pyrite and Arsenopyrite in a Gold Sulfide Concentrate

    By D E. G Connelly, K Y. Wong

    Gold at the Harbour Lights Mine (HLM), WA occurs principally in pyrite (Py) and arsenopyrite (AsPy) minerals rendering it inaccessible to direct cyanidation. Froth flotation produces a concentrate wit

    Jan 1, 2005

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    Assessment of Effectiveness of Artificial Recharge for Coal Seam Gas Water Management Based on Numerical Modelling

    By C Rothfuss, X Wang, S J. Herbert, K Prasad

    The extraction of groundwater to produce gas from coal seam gas (CSG) reservoirs has highlighted the opportunity for beneficial uses of groundwater in Australia. This paper presents an assessment of a

    Nov 26, 2013

  • AUSIMM
    TBM Design and Performance of Today - A Rapid Development - Where Will it End?

    The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more

    Jan 1, 1993

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    The Application of Ausmelt's AM28 Alkyl Hydroxamate Flotation Reagent to Fox ResourcesÆ West Whundo Copper Ore at Radio Hill, Western Australia

    By K Lee, L Mann, J Bygrave, G Sheldon

    Ausmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a

    Jan 1, 2007

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Exploration Possibilities for Diamonds in Victoria

    Diamonds occur in N.S.W., Victoria and north west Tasmania. Diamonds from different areas appear to have their own characteristics, lending weight to the suggestion that three or four different sou

    Jan 1, 1979

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    XPAC Destination Scheduling for Waste Dumps at BHP Billiton

    By G J. Butler

    Since 2005 BHP Billiton Iron Ore has been working with the consulting company Runge to implement the software XPAC Advanced Destination Scheduler (ADS) in life-of-mine studies. The Mt Whaleback mine,

    Jan 1, 2007

  • AUSIMM
    A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy Concept

    By G Turner-Saad

    An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics

    Sep 5, 2011

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete? (c0b4033c-7bcc-4cd7-babd-7aa89f5e67ef)

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 km NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018