Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Automated, online measurement of bulk material size distribution on conveyor using 3D profile imaging at Boliden Mines

    By M J. Thurley, L Lindqvist, D Degerfeldt, J Nyström, R Nordenskjöld

    Rock breakage is a major component of all mining and mineral processing operations with the particle size distribution linked to productivity through the comminution chain. Optimisation and automatic

    Aug 29, 2018

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Selecting and Implementing the Right Technology

    The selection and implementation of the right technology for a project is critical to the future development of the resource industry. It is essential for companies to ensure ongoing competitive viabi

    Jan 1, 2006

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    Tectonics of Southern Pacrim

    Four data sets are required to put constraints on the tectonic evolution of the southern rim of the Pacific Ocean basinI . data bearing on the dispersal of the major Gondwanaland continental fragments

    Jan 1, 1990

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Real Option Value Optimisation

    By J Gould, T Elkington

    Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr

    May 24, 2012

  • AUSIMM
    The New System of Structural Analysis in Drillcore (5e6b1b05-501c-47dd-af5d-a853c9b25af1)

    A comprehensive analysisof rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engine

    Jan 1, 1990

  • AUSIMM
    The Mt Kasi high sulphidation Au system, Fiji

    By Taylor GP

    Mt Kasi in Fiji is a high sulphidation style of gold deposit exposed at a high crustal level. Individual alteration centres are localised at the intersection of cross structures within a through-going

    Jan 1, 1994

  • AUSIMM
    Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, Australia

    By Read T. A

    THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to

    Jan 1, 1921

  • AUSIMM
    Quantitative Risk Assessment Tools to Assist with Waste Management and Placement Guidelines

    By S Lehane, S Pearce

    The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these

    Jul 27, 2015

  • AUSIMM
    A day in the life of a mineworker in 2045

    By G McCullough, J Bassan, d P. Knights, C T. Farrelly

    By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme

    Sep 1, 2024

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Harnessing data complexity – how machine learning applies all project data for accurate resource modelling

    By S Sullivan

    A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in

    Mar 22, 2022

  • AUSIMM
    Is Ion-Exchange Technology for Gold Extraction Ready for Commercialisation?

    By J S. J van Deventer, D C. Shallcross

    New developments are taking place in the recovery of gold from leached pulps that are based upon the adsorption of the metal cyanide species onto ion exchange resins. Despite the success of several re

    Jan 1, 1998

  • AUSIMM
    Effect of mill-scale and calcined dolomite on high Al2O3 sinter and its reduction behaviour

    By S J. Kim, S W. Kim, L Tomas da Rocha, S Jung

    Al2O3 has been regarded as a harmful gangue component in iron ore, especially causing reduction degradation in industrial sintering of iron ore. The current study aimed to utilise low-grade iron ore c

    Jun 19, 2024

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    The Use of a Portable Aerosol Counting System to Characterize Dust Clouds and Evaluate Control Methods in Underground Metal Mines

    By Bigu J, Grenier M. G, Knight G

    Particulate control is a major concern in underground mining and the subject of continuing research world wide. In Canada the federal government's Mining Research Laboratory at EIIiot Lake, O

    Jan 1, 1988