Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Performance of a Drainage Tunnel and Subvertical Drain System

    By J Y. C Lo

    The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d

    Mar 8, 2011

  • AUSIMM
    A review of damage caused by the 1993 Finisterre Range earthquakes, Papua New Guinea

    By Browne TJ

    On 13 October 1993, a shallow earthquake registering 7.1 on the Richter Scale occurred near Tauta in the Finisterre Range of Papua New Guinea (PNG) killing 37 people. The aftershock series lasted thre

    Jan 1, 1994

  • AUSIMM
    Improvements in Blast Fragmentation Models Using Digital Image Processing

    By E Mofya, R Kaunda, P Lever

    One of the fundamental requirements for being able to optimise blasting is the ability to predict fragmentation. An accurate blast fragmentation model allows a mine to adjust the fragmentation size fo

    Jan 1, 2001

  • AUSIMM
    Mathematical and Physical Simulation of Non-Uniform Liquid Drainage in Packed Beds

    By Pinczewski WV, Nowak LP, Tanzil WBU, Jenkins DR, McCarthy MJ

    An experimental and theoretical study has been made of the drainage behaviour of two-dimensional packed beds drained from an outlet in the sidewall of the bed in order to identify the fundamental m

    Jan 1, 1981

  • AUSIMM
    Ventilation Challenges Facing the Metalliferous Sector

    By D J. Brake

    The underground metalliferous mining industry continues to change under the influence of many factors including, to name a few, new mining techniques and equipment, new approaches to risk management,

    Jul 1, 2013

  • AUSIMM
    Resue Mining with eDev™ Electronic Detonators at Stawell Gold Mines

    By C Hamilton

    Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete

    Mar 21, 2011

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • AUSIMM
    Differentiation of Mafic and Ultramafic Rocks in the Pilbara of WA, Using Remote Sensing Techniques

    By Moore R. F, Macias L. F

    The Filbara region of northwestern Western Australia contains several known occurrences of mafic/ultramafic rock assemblages which may host platinum group element (POE) mineralisation. This paper de

    Jan 1, 1988

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Mining Administration and Legislation

    This paper discusses some topical issues on the mining administration and legislation fields including:  1. Licensing û Administration and associated specialist functions including:Processin

    Jan 1, 1982

  • AUSIMM
    Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design Curves

    By M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony

    During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u

    Aug 24, 2015

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Low Shock Energy Emulsion Based Wet Hole Explosives

    By Moxon N. T

    A series of low shock energy water resistant emlulsion based explosives have been developed by combining inert materials, such as Perlite P500, into the formulation. The material handling, water res

    Jan 1, 1990

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Risk assessment tool for mines using diesel-powered mobile equipment

    By A Reid, A W. Musk, O Jones

    In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa

    Oct 16, 2017

  • AUSIMM
    Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering Application

    By C Bie, S Li, P Xiao, P Zhao, H Lin

    "Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi

    Aug 31, 2015

  • AUSIMM
    Iron Ore Characteristics and their Application in Optimising the Granulation Process

    By R Zhang, X Huang, M Zhou, X Lv, C Bai

    Iron ore sinter accounts for a large proportion of blast furnace ferrous burden in Chinese steel mills. Depleting high-grade iron ore resources and spreading complexity of iron ores in mineralogy and

    Aug 12, 2013