    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Case studies for integrating rehabilitation planning with mine planning in strip mining

    By I Neilsen, A Walker, A Hooper

    Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H

    Jul 25, 2018

  • AUSIMM
    The Ernest Henry Mine Project - "The Mining Cycle"

    By T Amiconi

    Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro

    Jan 1, 1998

  • AUSIMM
    Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety Program

    By S Flanagan, M M. Mete, A R. Tiryaki, M Guresci

    First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc

    Apr 16, 2024

  • AUSIMM
    Dense media separation – a valuable process for preconcentration

    By I Grewal, M Lundt

    Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi

    Sep 11, 2017

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

    By J P. Evert

    Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod

    Mar 29, 2023

  • AUSIMM
    Business Transformation - Lessons Learnt for Successful Change

    By G Campbell-Cowan

    Much has been written about the fact that most transformation efforts disappoint. This paper addresses factors that should be taken into consideration in planning and implementing transformation progr

    Nov 20, 2012

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Effect of Dynamic Pressure on Electronic Detonator Timing

    By R Ibarra, H Solis, G Teowee, B E. Papillon

    The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d

    Aug 24, 2015

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    Why is the Mineral Processing Field Behind in the Application of New Technology?

    Mineral processing is at the hub of the exploration-mining-metals production system. Because of the large volumes of material processed, incremental technology investments can pay off better than fo

    Jan 1, 1993

  • AUSIMM
    Thermosensitive, Hydrophobically Modified Anionic Flocculants for Dewatering Kaolin Clays

    By D R. L Vedoy, L Botha, S P. Gumfekar, J B. P Soares

    Most of the known in-place reserves of oil sands are found in Canada. These oil sands ores are mined using various processes to extract bitumen. The by-product slurry resulting from the extraction pro

    Jul 27, 2015

  • AUSIMM
    Professional Development for Metallurgists – Improving Technical Skills

    By D Drinkwater

    In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was

    Aug 8, 2011

  • AUSIMM
    A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industry

    By M Haest, O Dominguez, D Mittrup

    Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn

    May 9, 2017

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Iron Ore Tailings Reprocessing to Maximise Ore Production

    By I Sherrell, R Jain

    Worldwide iron ore feed grades are trending downwards and will continue to do so with the increasing difficulties of upgrading ores. This has led to operations looking for ways to capture current tail

    Jul 13, 2015