Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Novel Vat Leaching System

    By W. J. Young, K. B. Macneill, C. N. Smith

    "A BRIEF HISTORY OF THE MURRAY BROOK MINERAL DEPOSITDuring the mid-1950's intensive exploration activity in northern New Brunswick followed the discovery of the world class Brunswick base metal deposi

    Jan 1, 1993

  • CIM
    Stirred Milling at Anglo American Platinum

    By Chris Rule

    This paper tells the story of the rapid commercial application of stirred milling technology at Anglo American Platinum?s many Concentrators. The first stirred mill ? a 10 000 litre IsaMillTM; the lar

    Jan 1, 2012

  • CIM
    World’s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation (26e1b765-3ec1-447d-8206-6ab79dbb100f)

    By Rajiv Kalra, Ji Jiangang

    "This paper reviews the following aspects of the world’s largest manufactured Grinding Mill’s in terms of diameter and power, along with the world’s biggest shop assembly and trial run of the mills de

    Jan 1, 2012

  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007

  • CIM
    Mechanical properties of 3XX aluminum alloy test bars from the ASTM B108 and a modified mould in as-cast and heat-treated conditions

    By D. Emadi

    The ASTM B108 Mould and a Modified Mould were used to cast test bars under a variety of conditions: mould and pouring temperatures, mould coating and tilt. Mechanical properties were determined in the

    Jan 1, 2004

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Pressure Oxidation in Gold Circuits: Basic Ferric Arsenate Sulphate and Basic Ferric Sulphate Behaviour in Downstream Processing

    By M. A. Gomez, V. Yahorava, J. A. Strauss

    "It is accepted widely that pressure oxidation (POX) is the most appropriate technology for processing of arsenic containing refractory gold ores. However, studies on the stability of various iron-ars

    Jan 1, 2017

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Automatic (Mechanical) Coal Sampling

    By T E. Tibbetts

    This paper deals with coal sampling in general and with mechanical coal sampling in particular. The necessity of obtaining representative samples is emphasized. Other sections of the paper are devoted

    Jan 1, 1965

  • CIM
    An experimental investigation into the trapping model core pillars with reinforced fly ash composites

    By M. K. Mishra, U. M. R. Karanam

    Relative to slender pillars, larger size pillars exhibit improved strata control. Fly ash, though traditionally treated as a waste product, is emerging as an alternate engineering material. This paper

    Jan 1, 2008

  • CIM
    Flotation Process Neural Data Analysis and On-Line Monitoring

    By Heikki Laurila, Sirkka-Liisa Jämsä-Jounela, Jarkko Karesvuori

    "Artificial Intelligence includes excellent tools for the control and supervision of industrial processes. Several thousand industrial applications have been reported worldwide. Recently, the designer

    Jan 1, 2000

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • CIM
    The Benefits of Collaborative, Leveraged Industry-University Research Case Study of a McGill-CAMIRO Project

    By J. E. Nesset, L. S. Urbanoski, J. R. Goode

    "The benefits and advantages of pre-competitive, collaborative industry/university research are not always well appreciated. This paper presents the case study of a current collaborative project betwe

    Jan 1, 2001

  • CIM
    Landfill Mining as Demonstrated by the Example of Mining and Metallurgical Tips in the Harz Mountains, Lower Saxony, Germany

    By Torsten Zeller

    Due to the increasing worldwide demand for raw materials and the resulting rise in commodity prices more expensive processing that is able to utilize complex ores becomes economically viable. This and

    Aug 1, 2013

  • CIM
    The Economics of Coal Cleaning

    By G. A. Vissac

    IN THE preliminary design of a coal washery, the most important factor to evaluate is the ash content of the final product. The ash content permissible may be imposed by market demands, but, in the

    Jan 1, 1957

  • CIM
    Development of a spontaneous heating liability index of coal from kinetic parameters

    By H. B. Sahu, N. M. Mishra, D. C. Panigrahi

    The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di

    Jan 1, 2008

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015

  • CIM
    Design and Materials Selection of Autoclaves and Auxiliary Equipment

    By P. Cheung, J. Gulyas, R. Clary

    Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who

    Jan 1, 2004

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002